J G Construction Partnership
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Feb 2014
- Last 24 months
- 0 permits filed
86 permits since 2000: 58 completed, 20 never finaled, 8 expired or cancelled.
Of the 20 never-finaled permits, 20 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 2 never finaled. Typically 0 days from filing to permit and 8 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2014 | Completed final sign-off Mar 2014 | 2857 Mission St | repair existing back yard deck & stairs. less than 30% repair in kind.Details
repair existing back yard deck & stairs. less than 30% repair in kind. | $1,500 |
| Jul 2, 2012 | Never finaled filed Jul 2012, never issued | 3808 Mission St | response to nov 201066546. provide 1 hr garbage room at rear bldg. replace 1st floor stair at front bldg and return back to retail store at front bldg, gr level . legalize deck and connecting stairs to rear bldg. property line walls at both sides.Details
response to nov 201066546. provide 1 hr garbage room at rear bldg. replace 1st floor stair at front bldg and return back to retail store at front bldg, gr level . legalize deck and connecting stairs to rear bldg. property line walls at both sides. | $5,000 |
| Jun 14, 2012 | Never finaled issued Feb 2013, no final | 4348 Cesar Chavez St | building horizontal & deck expansion at rear. inter reconfiguration of bedrooms, bathrooms & stair. 1 bathroom added. kitchen remodel.Details
building horizontal & deck expansion at rear. inter reconfiguration of bedrooms, bathrooms & stair. 1 bathroom added. kitchen remodel. | $220,000 |
| Sep 24, 2007 | Completed final sign-off Sep 2007 | 160 Granada Av | repair dryrotted rear deck, flooring,railings,and post with redwood material.Details
repair dryrotted rear deck, flooring,railings,and post with redwood material. | $5,000 |