Back to bathroom remodel contractors
J Fitzsimmons Building Inc.
- Based in
- Oakland
- On San Francisco permits
- Jan 2013 to Jul 2025
- Last 24 months
- 1 permit filed
27 permits since 2000: 14 completed, 2 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 6 completed, 1 never finaled, 2 expired or cancelled. Typically 22 days from filing to permit and 518 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2017 | Completed final sign-off Nov 2018 | 111 Santa Paula Av | int reno to (e) kitchen, powder room, master suite, hall bath, laundry closet and 2 bedroomw ith new fixtures, fitting and finishes. install 2 (n) window units. install 2 new curb mounted roof skylight. provide hydronic radiant heating system throughout w/high efficiency combo domestic hot waterDetails
int reno to (e) kitchen, powder room, master suite, hall bath, laundry closet and 2 bedroomw ith new fixtures, fitting and finishes. install 2 (n) window units. install 2 new curb mounted roof skylight. provide hydronic radiant heating system throughout w/high efficiency combo domestic hot water | $225,000 |
| Aug 29, 2017 | Completed final sign-off Aug 2019 | 3800 Clay St | no expansion of existing building envelope. alterations to kitchen and bathrooms. structural work to accommodate layout changes.Details
no expansion of existing building envelope. alterations to kitchen and bathrooms. structural work to accommodate layout changes. | $80,000 |
| Feb 6, 2017 | Completed final sign-off Dec 2020 | 475 37th Av | 1st flr: lower level @ rear. demo wall for media rm, relocate bedroom, reconfigure rear doors, remodel bath, add interior stair. 2nd flr: relocate kitchen, demo wall replace and add rear and side windows not visible from street.Details
1st flr: lower level @ rear. demo wall for media rm, relocate bedroom, reconfigure rear doors, remodel bath, add interior stair. 2nd flr: relocate kitchen, demo wall replace and add rear and side windows not visible from street. | $150,000 |
| Dec 7, 2016 | Expired or cancelled expired Feb 2019 | 555 Laurel St | laundry remodel. master bathroom remodel. select window replacement in extg openings. 3 new skylights. remove decayed planters. repair decayed framing at rear door and window.Details
laundry remodel. master bathroom remodel. select window replacement in extg openings. 3 new skylights. remove decayed planters. repair decayed framing at rear door and window. | $80,000 |
| Nov 4, 2016 | Never finaled issued Nov 2016, no final | 2775 Union St | replace tiles in bathroom; replace fixtures in locations.Details
replace tiles in bathroom; replace fixtures in locations. | $25,000 |
| May 9, 2016 | Completed final sign-off Jun 2017 | 1 Mclaren Av | remodel kitchen & 2 baths. add bath/laundry to 2nd floor. remove load bearing wall & replace with beam. some new shear walls. remove & replace some doors/windows. new side landing. legalize recreation room and bathroom at basementDetails
remodel kitchen & 2 baths. add bath/laundry to 2nd floor. remove load bearing wall & replace with beam. some new shear walls. remove & replace some doors/windows. new side landing. legalize recreation room and bathroom at basement | $250,000 |
| Jun 1, 2015 | Expired or cancelled expired Sep 2019 | 390 28th St | vertical addition to a duplex. mech,elect,plumb & fire sprinkler under separate permits. total 2 kitches, 6 baths.Details
vertical addition to a duplex. mech,elect,plumb & fire sprinkler under separate permits. total 2 kitches, 6 baths. | $500,000 |
| May 29, 2015 | Completed final sign-off Nov 2015 | 126 Belvedere St | remodel bathroom, change lighting, merge two half baths to full bath on top level unit.Details
remodel bathroom, change lighting, merge two half baths to full bath on top level unit. | $25,000 |
| Apr 11, 2013 | Completed final sign-off Jan 2015 | 255 Webster St | remodel bathroom, new bath tub, toilet & sink in same location, new tile on floor.Details
remodel bathroom, new bath tub, toilet & sink in same location, new tile on floor. | $15,000 |