J David Huntsinger
- Based in
- Oakland
- On San Francisco permits
- Oct 2004 to Jan 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 1 days from filing to permit and 24 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2011 | Completed final sign-off Feb 2011 | 361 07th Av | replace (e) 5' wide window w/ door unit (5' wide). replace (e) rotten window (5'w x 4'h) with new window. build small deck (160 sq ft). windows not facing the street. landing & stairs 5'-3" above grade within buildable area, deck less then 30 inches above grade.Details
replace (e) 5' wide window w/ door unit (5' wide). replace (e) rotten window (5'w x 4'h) with new window. build small deck (160 sq ft). windows not facing the street. landing & stairs 5'-3" above grade within buildable area, deck less then 30 inches above grade. | $10,000 |