Back to bathroom remodel contractors
J C Woodworks & Design
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Jun 2013
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 5 days from filing to permit and 364 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2012 | Completed final sign-off Dec 2013 | 2417 15th St | renovation of existing second flat bath and kitchen. addition of 1 new bath on second level.Details
renovation of existing second flat bath and kitchen. addition of 1 new bath on second level. | $35,000 |
| Jun 5, 2012 | Never finaled issued Jun 2012, no final | 1969 Broadway | renovation of (e) kitchen & 2 bathrooms (all existing) & adjacent area. re-finish flooring & millwork at loungesDetails
renovation of (e) kitchen & 2 bathrooms (all existing) & adjacent area. re-finish flooring & millwork at lounges | $40,000 |
| Sep 15, 2011 | Completed final sign-off Apr 2013 | 447 03rd Av | addition of new interior bathroom, renovation of (e) interior bathroom, addition of new skylight.Details
addition of new interior bathroom, renovation of (e) interior bathroom, addition of new skylight. | $15,000 |
| Sep 7, 2011 | Completed final sign-off Apr 2012 | 9 Douglass St | new posts and footings at 1st floor, remove ceiling joists at kitchen and bedroom, combine 2 baths into 1 bath,reconfigure walls between bedroom and dinning room, install direct vent fireplace at living room, install new windows at new bath. remodel kitchen.Details
new posts and footings at 1st floor, remove ceiling joists at kitchen and bedroom, combine 2 baths into 1 bath,reconfigure walls between bedroom and dinning room, install direct vent fireplace at living room, install new windows at new bath. remodel kitchen. | $35,000 |
| Jun 26, 2008 | Completed final sign-off Jun 2009 | 1849 Filbert St | interior remodeling to relocate load bearing walls between the living rm and br andthe one between the hallway and masterbdroom. remodel ex. kitchen and bathroom. add 1 new bathroom and convert ex. pantry to office/laudry rmDetails
interior remodeling to relocate load bearing walls between the living rm and br andthe one between the hallway and masterbdroom. remodel ex. kitchen and bathroom. add 1 new bathroom and convert ex. pantry to office/laudry rm | $55,466 |
| Oct 12, 2007 | Expired or cancelled expired Nov 2008 | 611 Marina Bl | reconfiguration/remodel ground and 1st floor. 1st fl. - convert (e) office & (e) laundry to (n) family and pantry. ground fl - relocate (e) bathroom and convert (e) sitting room and closet into a new study room. convert portion of garage into new laundry room and storage.Details
reconfiguration/remodel ground and 1st floor. 1st fl. - convert (e) office & (e) laundry to (n) family and pantry. ground fl - relocate (e) bathroom and convert (e) sitting room and closet into a new study room. convert portion of garage into new laundry room and storage. | $10,000 |
| May 17, 2006 | Completed final sign-off Jan 2007 | 2066 Green St | 3 ceilings to be removed for structual inspection and replace in kind. kchn cabinetry to be removed and remodeling walls and ceiling to be removed in 2nd level bath wall covering. dining rm/living room plaster and lath to be removed for structural inspection approx. 310 sq at all areas to beDetails
3 ceilings to be removed for structual inspection and replace in kind. kchn cabinetry to be removed and remodeling walls and ceiling to be removed in 2nd level bath wall covering. dining rm/living room plaster and lath to be removed for structural inspection approx. 310 sq at all areas to be | $20,000 |