Back to bathroom remodel contractors
J C P Construction Inc
- Based in
- Oakland
- On San Francisco permits
- May 2009 to May 2016
- Last 24 months
- 0 permits filed
14 permits since 2000: 11 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 expired or cancelled. Typically 5 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2016 | Completed final sign-off Nov 2016 | 105 Hanover St | convert ground floor into habitable space - rooms not for sleeping (insufficient rear yard depth for escape/rescue), 1 bath, 1 car garage and family room. 2nd floor - relocate kitchen, add bath at existing kitchen area.Details
convert ground floor into habitable space - rooms not for sleeping (insufficient rear yard depth for escape/rescue), 1 bath, 1 car garage and family room. 2nd floor - relocate kitchen, add bath at existing kitchen area. | $75,000 |
| Dec 15, 2015 | Completed final sign-off Oct 2020 | 106 Circular Av | convert basement into habitable space. 2 bedrooms and 2 bath. keep one car parking. n/a for maher.Details
convert basement into habitable space. 2 bedrooms and 2 bath. keep one car parking. n/a for maher. | $70,000 |
| Dec 8, 2015 | Expired or cancelled expired Apr 2017 | 1990 30th Av | interior remodel at kitchen & bathroom, no change at floor plan. old sheetrock to remain.Details
interior remodel at kitchen & bathroom, no change at floor plan. old sheetrock to remain. | $10,000 |
| Sep 15, 2014 | Completed final sign-off Feb 2015 | 825 Geneva Av | convert basement into habitable space: 3 bedrooms, 2 bathrooms. remodel kitchen and bath and add one bath in breakfast area.Details
convert basement into habitable space: 3 bedrooms, 2 bathrooms. remodel kitchen and bath and add one bath in breakfast area. | $75,000 |
| Aug 27, 2014 | Completed final sign-off Feb 2015 | 831 Geneva Av | convert b/f into 2 bedrooms & 2 baths. upper floor - relocate kitchen, add 1 bath. repalce windows to dual panel.Details
convert b/f into 2 bedrooms & 2 baths. upper floor - relocate kitchen, add 1 bath. repalce windows to dual panel. | $85,000 |
| Jan 21, 2014 | Completed final sign-off Aug 2014 | 254 11th Av | convert 1st fl to habitable space. 1 bedroom, 1 bath, laundry room. total square footage 532. repair e rear deck. legalize 1 bath at 3rd fl. 1/2 bath at 2nd flDetails
convert 1st fl to habitable space. 1 bedroom, 1 bath, laundry room. total square footage 532. repair e rear deck. legalize 1 bath at 3rd fl. 1/2 bath at 2nd fl | $30,000 |
| Mar 7, 2012 | Completed final sign-off May 2012 | 1309 Baker St | add bathroom (shower stall, toilet & sinks) & closet to (e) sunroom at rear on 2nd floor only.Details
add bathroom (shower stall, toilet & sinks) & closet to (e) sunroom at rear on 2nd floor only. | $10,000 |
| Oct 25, 2010 | Completed final sign-off Jan 2013 | 1742 Bush St | addition of 1 bathroom in level 1. renovation of kitchen at level 2Details
addition of 1 bathroom in level 1. renovation of kitchen at level 2 | $30,000 |
| May 29, 2009 | Completed final sign-off Jun 2009 | 900 Bush St | unit 605 - replace bathroom tub and tub panel.Details
unit 605 - replace bathroom tub and tub panel. | $1,000 |