Back to bathroom remodel contractors
J B M Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Sep 2012
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 92 days from filing to permit and 330 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2010 | Expired or cancelled expired Apr 2012 | 1025 Natoma St | to comply with 201070886 replace in kind; repair damaged ceilings and walls in bathroom. repair water intrusion into unit 1025 from 1023 the unit above (leak) repair heating unit for 1025 unit located in the garage; both units only bathroom, no structural work, no new lightingDetails
to comply with 201070886 replace in kind; repair damaged ceilings and walls in bathroom. repair water intrusion into unit 1025 from 1023 the unit above (leak) repair heating unit for 1025 unit located in the garage; both units only bathroom, no structural work, no new lighting | $4,500 |
| Jul 24, 2007 | Completed final sign-off Dec 2008 | 142 Central Av | convert workshop into parking garage & extend existing bath by removing spiral stair between ground floor & 2/f.Details
convert workshop into parking garage & extend existing bath by removing spiral stair between ground floor & 2/f. | $18,000 |