Permit GraphShortlistSan Francisco building permits since 2000

J A M General Contractors Inc

Contractor license
949909
State license record
Based in
San Jose
On San Francisco permits
Oct 2014 to Oct 2019
Last 24 months
0 permits filed

4 permits since 2000: 2 completed, 2 never finaled.

Of the 2 never-finaled permits, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllKitchen remodel 2Bathroom remodel 2
FiledOutcomeAddressWork described on the permitDeclared cost
Oct 10, 2019Completed
final sign-off Feb 2020
154 Lombard Stkithcen remodel. remove and replace existing cabinets and counter top. remove appliances and add outlets. add led recessed lights in living rm. hook up sink.
Details
Permit
201910104201
Permit issued
Oct 10, 2019
Final sign-off
Feb 6, 2020

kithcen remodel. remove and replace existing cabinets and counter top. remove appliances and add outlets. add led recessed lights in living rm. hook up sink.

Open the permit page

$30,000
Apr 30, 2015Never finaled
issued Apr 2015, no final
88 Keystone Wyrevision to pa #2014.1022.9607 change in scope of work. - replace a kitchen window, remodel bathroom on main floor level, (n) fenestration max u-factor =0.40 (replace), bathroom exhaust terminate 3' from p.l. & openings. lighting per lel 150 (k). no changes to floor plan or fixture locations.
Details
Permit
201504305066
Permit issued
Apr 30, 2015

revision to pa #2014.1022.9607 change in scope of work. - replace a kitchen window, remodel bathroom on main floor level, (n) fenestration max u-factor =0.40 (replace), bathroom exhaust terminate 3' from p.l. & openings. lighting per lel 150 (k). no changes to floor plan or fixture locations.

Open the permit page

$14,000
Apr 30, 2015Completed
final sign-off Apr 2016
80 Keystone Wy(2) bathr remodel-1 @ 2nd flr, 1 @ 3rd flr, 1 window bath, elect, rewiring,plumbg,drywall,insulation. aluminum clad @ bath window, aligned w/(e) & reduced in size. replace drywall in living rm, din rm, entry & closet. elect work in liv,din rms. (n) fenestration max u-fac 0.40 (replace).
Details
Permit
201504305017
Permit issued
Apr 30, 2015
Final sign-off
Apr 29, 2016

(2) bathr remodel-1 @ 2nd flr, 1 @ 3rd flr, 1 window bath, elect, rewiring,plumbg,drywall,insulation. aluminum clad @ bath window, aligned w/(e) & reduced in size. replace drywall in living rm, din rm, entry & closet. elect work in liv,din rms. (n) fenestration max u-fac 0.40 (replace).

Open the permit page

$40,000
Oct 22, 2014Never finaled
issued Oct 2014, no final
88 Keystone Wykitchen remodel: replace cabinets with non cabinets, new countertop, paint & flooring, sink hook up, new electrical outlet & new appliances. no walls moved, remvoed or added. all fixture & appliance layouts to remain unchanged.
Details
Permit
201410229607
Permit issued
Oct 22, 2014

kitchen remodel: replace cabinets with non cabinets, new countertop, paint & flooring, sink hook up, new electrical outlet & new appliances. no walls moved, remvoed or added. all fixture & appliance layouts to remain unchanged.

Open the permit page

$30,000