Back to bathroom remodel contractors
J A Emmanuel Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Oct 2016
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 41 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2012 | Completed final sign-off May 2012 | 1330 11th Av | remodel bathroom: include remove tile wall, sheetrock, replace (e) bath tub, replace toilet, sink, tile floor, (e) ceiling, exhaust bath fan, install new sheetrock and tapping in bathroom. 1/f unit only.Details
remodel bathroom: include remove tile wall, sheetrock, replace (e) bath tub, replace toilet, sink, tile floor, (e) ceiling, exhaust bath fan, install new sheetrock and tapping in bathroom. 1/f unit only. | $7,000 |
| Dec 18, 2006 | Completed final sign-off Jan 2008 | 151 Peralta Av | interior alterations - new bath, remodel (e) bath , new interior stair, lighting, skylights, windows, insulation, remove vinyl siding.Details
interior alterations - new bath, remodel (e) bath , new interior stair, lighting, skylights, windows, insulation, remove vinyl siding. | $100,000 |
| May 15, 2006 | Completed final sign-off Jul 2006 | 1447 22nd Av | remove extg damage tiles around bath tub in 1st bthrm/remove extg sheet rock in all bathroom. walls and ceiling remove the tiles floor. remodeling put new sheetrock in bthrm and tiles the floor. small bthrm. remove tiles damage in the walls in floor the same bthrm/install electrical 16 fic 110Details
remove extg damage tiles around bath tub in 1st bthrm/remove extg sheet rock in all bathroom. walls and ceiling remove the tiles floor. remodeling put new sheetrock in bthrm and tiles the floor. small bthrm. remove tiles damage in the walls in floor the same bthrm/install electrical 16 fic 110 | $18,400 |
| Oct 12, 2005 | Completed final sign-off Nov 2005 | 1330 Revere Av | remove old bath,tile. new jacuzzi. run 220 line from main panel to jacuzzi. tile around jacuzziand floor work on 2nd flrDetails
remove old bath,tile. new jacuzzi. run 220 line from main panel to jacuzzi. tile around jacuzziand floor work on 2nd flr | $3,000 |