Izmirian Roofing Sheet Metal
- Based in
- San Mateo
- On San Francisco permits
- Jan 2000 to Jun 2024
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 4 days from filing to permit and 52 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2020 | Completed final sign-off Sep 2020 | 3932 23rd St | reroofing - flat roof only: remove existing tar and gravel roof down to wood deck. install certainteed #g-n-b4 built up roof assemblyDetails
reroofing - flat roof only: remove existing tar and gravel roof down to wood deck. install certainteed #g-n-b4 built up roof assembly | $17,095 |