Back to bathroom remodel contractors
Iz & J Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2023 to Feb 2025
- Last 24 months
- 1 permit filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2025 | Completed final sign-off May 2025 | 333 Bush St | unit 3804: remodel primary bathroom in-kind, new plumbing fixtures, new shower pan. living room: install 3 lights, raises 7 light switches. current light switches are too low for the customerDetails
unit 3804: remodel primary bathroom in-kind, new plumbing fixtures, new shower pan. living room: install 3 lights, raises 7 light switches. current light switches are too low for the customer | $17,000 |
| May 31, 2024 | Completed final sign-off Jul 2024 | 1161 Ingerson Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Dec 8, 2023 | Completed final sign-off Apr 2024 | 2231 34th Av | remodel (e) kitchen. remodel (e) full bath.Details
remodel (e) kitchen. remodel (e) full bath. | $55,000 |
| May 11, 2023 | Completed final sign-off Oct 2023 | 238 Ortega St | bathroom remodel in-kind. no structural changes. new plumbing fixtures. replace tub for walk-in shower. replace (e) lights for recessed lights. paint bathroom.Details
bathroom remodel in-kind. no structural changes. new plumbing fixtures. replace tub for walk-in shower. replace (e) lights for recessed lights. paint bathroom. | $19,000 |
| Mar 20, 2023 | Completed final sign-off Jan 2024 | 530 Chestnut St | unit 201c: master bath remodel in kind. no structural changes. remove the tub, installl new shower stall shower, neew plumbing fixture. replace (e) electrical outlet with new ones. replace (e) fan with new one. guest bath: retile the shower walls, new plumbing fixtures. emergency hot and coldDetails
unit 201c: master bath remodel in kind. no structural changes. remove the tub, installl new shower stall shower, neew plumbing fixture. replace (e) electrical outlet with new ones. replace (e) fan with new one. guest bath: retile the shower walls, new plumbing fixtures. emergency hot and cold | $45,000 |