Ishida Builders
- Based in
- San Mateo
- On San Francisco permits
- Apr 2013 to Jun 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 21 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2013 | Completed final sign-off Apr 2013 | 101 Los Palmos Dr | replace (e) handrails on existing concrete deck - 42" height spacing not to exceed 4", bolt mudsill to concret foundation, install (3) simpson holddowns on 4x4 posts -5/8' galv all thread 7" embed. all wt in basement. install ufp10 -sds3 where low clearance will not permit bolting.Details
replace (e) handrails on existing concrete deck - 42" height spacing not to exceed 4", bolt mudsill to concret foundation, install (3) simpson holddowns on 4x4 posts -5/8' galv all thread 7" embed. all wt in basement. install ufp10 -sds3 where low clearance will not permit bolting. | $6,000 |