Back to bathroom remodel contractors
Isaam Construction Inc
- Based in
- Hayward
- On San Francisco permits
- Sep 2021 to Apr 2026
- Last 24 months
- 2 permits filed
8 permits since 2000: 4 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 77 days from filing to permit and 1031 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2021 | Completed final sign-off Oct 2024 | 1153 Florida St | interior remodeling of existing 2-unit residential bldg. conversion of non-habitable space at 1st fl to 1 bedroom, family room, 1 and 1/2 bath. modification to interior layout at 2nd and 3rd fl. replace roof, replace existing windows, replace sidewalk.Details
interior remodeling of existing 2-unit residential bldg. conversion of non-habitable space at 1st fl to 1 bedroom, family room, 1 and 1/2 bath. modification to interior layout at 2nd and 3rd fl. replace roof, replace existing windows, replace sidewalk. | $650,000 |