Interval Solutions
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Sep 2006
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2006 | Expired or cancelled expired Sep 2007 | 44 Pixley St | seismic retrofit foundation add 5x8 anchor bolt every 4'oc to secure sole plate to foundation wall. add 2x4 blocking at base of secured wall studs, 10d 3x148 common. at 4" nailing on edge and way 12" spacing on field. all framing clips a34/a45 at the ream joice to top plate. spaced oc between floorDetails
seismic retrofit foundation add 5x8 anchor bolt every 4'oc to secure sole plate to foundation wall. add 2x4 blocking at base of secured wall studs, 10d 3x148 common. at 4" nailing on edge and way 12" spacing on field. all framing clips a34/a45 at the ream joice to top plate. spaced oc between floor | $11,000 |