Back to bathroom remodel contractors
Interior Renovations/Sf Renovations
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Apr 2026
- Last 24 months
- 4 permits filed
58 permits since 2000: 49 completed, 1 in progress, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 19 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2026 | In progress issued Apr 2026 | 506 11th Av | kitchen and bathroom. add (n) prime bath and reconfigure closets.Details
kitchen and bathroom. add (n) prime bath and reconfigure closets. | $42,000 |
| Dec 23, 2025 | Completed final sign-off Jan 2026 | 506 11th Av | revision 202410173184 to abate nov 202180480 - reduce scope of work from original permit to only include remove (e) unpermitted bathroom at rear. legalize deck (e).Details
revision 202410173184 to abate nov 202180480 - reduce scope of work from original permit to only include remove (e) unpermitted bathroom at rear. legalize deck (e). | $3,300 |
| Jul 8, 2025 | Completed final sign-off Dec 2025 | 2838 Union St | in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s). | $12,000 |
| Feb 12, 2020 | Completed final sign-off May 2020 | 819 45th Av | remodel bath - remove & replace fixtures & finishes. add new 2x2 foot skylight.Details
remodel bath - remove & replace fixtures & finishes. add new 2x2 foot skylight. | $26,000 |
| Dec 6, 2019 | Completed final sign-off Oct 2021 | 18 Beaver St | remodeling (e) kitchen & bathroom by changing the layouts, adding a new mini bar area, new windows, to the light well, replacing (e) windows in kind, new fireplace & minor roof work based on new venting, some electrical work, no change on existing floor area. no structural & landing wall.Details
remodeling (e) kitchen & bathroom by changing the layouts, adding a new mini bar area, new windows, to the light well, replacing (e) windows in kind, new fireplace & minor roof work based on new venting, some electrical work, no change on existing floor area. no structural & landing wall. | $75,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2019 | 234 10th Av | guest bath remodel, remove/replace fixtures & finishes, convert (e) tub to shower. no change of (e) floor plan).Details
guest bath remodel, remove/replace fixtures & finishes, convert (e) tub to shower. no change of (e) floor plan). | $23,000 |
| Oct 9, 2018 | Completed final sign-off Feb 2019 | 234 10th Av | remodel powder room - remove & replace fixtures & finishes. 1/2 bathDetails
remodel powder room - remove & replace fixtures & finishes. 1/2 bath | $10,000 |
| Mar 5, 2018 | Completed final sign-off Jul 2018 | 2838 Union St | rev app# 20801037741 expand master bath into (e) bedroom, remove and replace (2) windowsDetails
rev app# 20801037741 expand master bath into (e) bedroom, remove and replace (2) windows | $8,000 |
| Jan 3, 2018 | Completed final sign-off Nov 2018 | 2838 Union St | 2/f: bath remodel, remove/replace fixtures & finishes, add shower (no change of (e) layout)Details
2/f: bath remodel, remove/replace fixtures & finishes, add shower (no change of (e) layout) | $25,000 |
| Apr 20, 2016 | Completed final sign-off Oct 2016 | 819 45th Av | addition to 1st floor below (e) living space new bedroom, bathroom & office on 1st floor. demo exterior staircase & add (n) interior stairs. (n) laundry room @ 1st floorDetails
addition to 1st floor below (e) living space new bedroom, bathroom & office on 1st floor. demo exterior staircase & add (n) interior stairs. (n) laundry room @ 1st floor | $106,500 |
| Jul 14, 2015 | Expired or cancelled cancelled Mar 2017 | 436 Corbett Av | remove illegal unit from garage area. remove kitchen and legalize 1/2 bath. cap all utilities at source.Details
remove illegal unit from garage area. remove kitchen and legalize 1/2 bath. cap all utilities at source. | $5,000 |
| Jun 25, 2015 | Completed final sign-off Jun 2016 | 14 Guy Pl | bath remodel: remove and replace finishes and fixtures, no change on walls.Details
bath remodel: remove and replace finishes and fixtures, no change on walls. | $25,000 |
| Jan 29, 2014 | Completed final sign-off Jun 2014 | 54 Palm Av | bath remodel - remove & replace vanity & sinks, add towel warmer. compliance with ordinance #155-13 not requiredDetails
bath remodel - remove & replace vanity & sinks, add towel warmer. compliance with ordinance #155-13 not required | $8,000 |
| Oct 15, 2012 | Completed final sign-off Jan 2013 | 145 Magnolia St | add laundry room & combine 2 (e) baths into 1 at level 2. remove 4 feet of non-bearing partition.Details
add laundry room & combine 2 (e) baths into 1 at level 2. remove 4 feet of non-bearing partition. | $27,500 |
| Aug 26, 2011 | Completed final sign-off Feb 2012 | 49 Carmelita St | renovating kitchen fixtures & finishes. renovate bathroom, (n) lighting comply cec 150(k), not moving or adding any walls, no structural work, provide carbon monoxide detector per code.Details
renovating kitchen fixtures & finishes. renovate bathroom, (n) lighting comply cec 150(k), not moving or adding any walls, no structural work, provide carbon monoxide detector per code. | $17,000 |
| May 17, 2011 | Completed final sign-off Oct 2011 | 3028 Buchanan St | demolishing 2 (e) brick chimneys & relocating/actering interior non bearing partitions, renovating kitchen fixtures & finishes. renovate bathroom.Details
demolishing 2 (e) brick chimneys & relocating/actering interior non bearing partitions, renovating kitchen fixtures & finishes. renovate bathroom. | $21,500 |
| Apr 23, 2010 | Completed final sign-off Jul 2010 | 6140 California St | remodel master bath to include removal of one non structural partition and remove and replace wc, sink, tub and shower. work on 3rd floor.Details
remodel master bath to include removal of one non structural partition and remove and replace wc, sink, tub and shower. work on 3rd floor. | $27,000 |
| Feb 11, 2010 | Completed final sign-off Mar 2010 | 1089 De Haro St | bathroom remodel to include removal of 1 non-structural partition, relcoate sink and wc, remove tub and replace with shower. all work on 2nd floor. provide high efficacy lights on "manual on" o.s. per t-24.Details
bathroom remodel to include removal of 1 non-structural partition, relcoate sink and wc, remove tub and replace with shower. all work on 2nd floor. provide high efficacy lights on "manual on" o.s. per t-24. | $2,600 |
| Nov 23, 2009 | Completed final sign-off Feb 2010 | 49 Carmelita St | remodel master bath room. replace tub with new shower. remove and replace wc and vanity. no wall removal. no structural work, new lighting & replace (e) exhaust fan , provide high efficancy lightsd or "manual on" occupancy sensor.Details
remodel master bath room. replace tub with new shower. remove and replace wc and vanity. no wall removal. no structural work, new lighting & replace (e) exhaust fan , provide high efficancy lightsd or "manual on" occupancy sensor. | $22,000 |
| Sep 7, 2004 | Completed final sign-off Nov 2004 | 1942 Eddy St | bathroom remodel, replace tub with shower, new fixtures, and finishesDetails
bathroom remodel, replace tub with shower, new fixtures, and finishes | $8,500 |
| Feb 27, 2002 | Completed final sign-off Feb 2003 | 3967 Clay St | remove and replace wall finishes and fixtures in master and guest bathroomsDetails
remove and replace wall finishes and fixtures in master and guest bathrooms | $30,000 |