Back to bathroom remodel contractors
Integrity Design And Build Group
- Based in
- Daly City
- On San Francisco permits
- Jun 2026 to Oct 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 in progress. Typically 12 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Oct 2026 | 436 Edinburgh St | 1st flr: infill under sunroom. add 1 bedroom, 1 full bath, and family with wetbar. 2nd flr: remodel (e) living and dining room. reconfigure kitchen and powder room. 3rd flr: remodel (e) bedrooms and bathroom. add 1 full bath. replace front windows in kind with vinyl. replace vinyl siding withDetails
1st flr: infill under sunroom. add 1 bedroom, 1 full bath, and family with wetbar. 2nd flr: remodel (e) living and dining room. reconfigure kitchen and powder room. 3rd flr: remodel (e) bedrooms and bathroom. add 1 full bath. replace front windows in kind with vinyl. replace vinyl siding with | $280,000 |
| Jun 5, 2026 | In progress issued Jun 2026 | 286 25th Av | 1st fl: relocate laundry and utilities, 2nd fl reconfigure kitchen and dining rm per plan, relocate powder rm, 3rd fl remodel e bath per plan, new closet in e bathrooms and new laundryDetails
1st fl: relocate laundry and utilities, 2nd fl reconfigure kitchen and dining rm per plan, relocate powder rm, 3rd fl remodel e bath per plan, new closet in e bathrooms and new laundry | $68,000 |