Integral Fire Protection Inc
- Based in
- Pittsburg
- On San Francisco permits
- Aug 2021 to May 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2025 | Completed final sign-off Jul 2025 | 1485 Bush St | emergency repair of leaking fire serive, saw cut sidewalk & excavate (3' x 9'). replace leaking pipe w/ new pipe. backfill excavation & repave sidewalkDetails
emergency repair of leaking fire serive, saw cut sidewalk & excavate (3' x 9'). replace leaking pipe w/ new pipe. backfill excavation & repave sidewalk | $18,200 |
| Oct 14, 2021 | Completed final sign-off Apr 2022 | 1288 30th Av | install new fire sprinkler system ref pa 2021-0820-6805 as-builts. ref adu plans 201911086922/6921.Details
install new fire sprinkler system ref pa 2021-0820-6805 as-builts. ref adu plans 201911086922/6921. | |
| Aug 24, 2021 | Completed final sign-off Feb 2022 | 1288 30th Av | revised underground service from previously approved pa#2021-0820-0805 which was 1 1/2" service and 15 gpm domestic flow to a new 2" service with 27 gpm domestic flow.Details
revised underground service from previously approved pa#2021-0820-0805 which was 1 1/2" service and 15 gpm domestic flow to a new 2" service with 27 gpm domestic flow. | $1,500 |
| Aug 20, 2021 | Completed final sign-off Apr 2022 | 1288 30th Av | install new nfpa-13r fire sprinkler system on teh first floor of the building as required under building pa 201911086921Details
install new nfpa-13r fire sprinkler system on teh first floor of the building as required under building pa 201911086921 | $10,000 |