Back to bathroom remodel contractors
Integra Design Build
- Based in
- El Cerrito
- On San Francisco permits
- Mar 2000 to Feb 2024
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 29, 2024 | Completed final sign-off Mar 2025 | 4027 Folsom St | kitchen & bath repair/ remodel: replace plumbing fixtures. replace tub/ w pre-fab shower pan/ enclosure. no change to walls. add dedicated kitchen/ bath of 1 outlets/ shower pan/ enclosure.no change to walls. add dedicated kitchen/ bath gfi outlets/ circuits as required. replace appliances & bathDetails
kitchen & bath repair/ remodel: replace plumbing fixtures. replace tub/ w pre-fab shower pan/ enclosure. no change to walls. add dedicated kitchen/ bath of 1 outlets/ shower pan/ enclosure.no change to walls. add dedicated kitchen/ bath gfi outlets/ circuits as required. replace appliances & bath | $120,000 |
| Sep 29, 2023 | Expired or cancelled withdrawn Jan 2024 | 4027 Folsom St | repair & remodel of rental dwelling unit. work to include kitchen & bath remodel, addition of washer & dryer, water heater & furnace replacement. work also includes closet reconfiguration. all per included drawers. legalization under separate permit (pa #202309297689).Details
repair & remodel of rental dwelling unit. work to include kitchen & bath remodel, addition of washer & dryer, water heater & furnace replacement. work also includes closet reconfiguration. all per included drawers. legalization under separate permit (pa #202309297689). | $16,400 |
| Nov 28, 2022 | Completed final sign-off Aug 2023 | 2225 23rd St | kitchen and bath remodel: replace plumbing fixtures, same locaiton. replace tub with shower, pan w/ liner. no structural work. no changes to walls. replace cabinets and countertops. replace sheet flooring. replace tile. replace light fixtures. add (2) light fixtures to bath, (3) to kitchen. (n) dediDetails
kitchen and bath remodel: replace plumbing fixtures, same locaiton. replace tub with shower, pan w/ liner. no structural work. no changes to walls. replace cabinets and countertops. replace sheet flooring. replace tile. replace light fixtures. add (2) light fixtures to bath, (3) to kitchen. (n) dedi | $80,000 |
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 2287 18th Av | cover central patio on main floor and frame over with ceiling and roof. reconfigure walls to accommodate relocated kitchen and new master bath and closet. refer to drawings for full description and details.Details
cover central patio on main floor and frame over with ceiling and roof. reconfigure walls to accommodate relocated kitchen and new master bath and closet. refer to drawings for full description and details. | $200,000 |
| Jul 1, 2016 | Completed final sign-off Aug 2016 | 121 Leese St | top floor,one bathrm remodel: fixture replacement,same location,tub shower,wc,sinkvanity,bath fan &lighting & outlet,feed new elec circuits if required,remove & replace plaster/drywall,repair dryrot as needed.Details
top floor,one bathrm remodel: fixture replacement,same location,tub shower,wc,sinkvanity,bath fan &lighting & outlet,feed new elec circuits if required,remove & replace plaster/drywall,repair dryrot as needed. | $25,000 |
| Jun 6, 2000 | Completed final sign-off Jan 2001 | 858 40th Av | remodel to kitchen, bath and laundry on first floor,demo finishes, frame doorway to kitchenDetails
remodel to kitchen, bath and laundry on first floor,demo finishes, frame doorway to kitchen | $85,000 |