Back to bathroom remodel contractors
Innovative Construction & Design Co.
- Based in
- San Rafael
- On San Francisco permits
- Aug 2007 to Sep 2019
- Last 24 months
- 0 permits filed
29 permits since 2000: 22 completed, 7 never finaled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 3 never finaled. Typically 8 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2019 | Completed final sign-off Jun 2020 | 205 Dellbrook Av | gr fl: enlarge fl bath with shower and tub, remove wall cabinet and add , new window at office, expand closet at bedroom, window above utility sink, delete door to hallway. upper level: dlete wall separating kitchen akd living area. kitchen remodel, new hood, peninsula, delete opening btwn entryDetails
gr fl: enlarge fl bath with shower and tub, remove wall cabinet and add , new window at office, expand closet at bedroom, window above utility sink, delete door to hallway. upper level: dlete wall separating kitchen akd living area. kitchen remodel, new hood, peninsula, delete opening btwn entry | $85,000 |
| Feb 5, 2018 | Never finaled filed Feb 2018, never issued | 551 Nevada St | kitchen remodel-remove and replace cabinets and counter tops. bathroom -replace vanity and bathtubDetails
kitchen remodel-remove and replace cabinets and counter tops. bathroom -replace vanity and bathtub | $11,500 |
| Jun 16, 2017 | Never finaled issued Jun 2017, no final | 551 Nevada St | partially comply w/ nov #201449314 to obtain permit for kitchen & bathroom remodel in unit 'a' residential apartment, replace sheetrock w/ 5/8" type x gyp board, no (n)wall & no (e)wall relocation, lighting for kitchen & bathroom remodelling shall comply w/ cec 150.0(k)3 & 150.0(k)5 resp.Details
partially comply w/ nov #201449314 to obtain permit for kitchen & bathroom remodel in unit 'a' residential apartment, replace sheetrock w/ 5/8" type x gyp board, no (n)wall & no (e)wall relocation, lighting for kitchen & bathroom remodelling shall comply w/ cec 150.0(k)3 & 150.0(k)5 resp. | $15,000 |
| Sep 30, 2016 | Completed final sign-off Feb 2017 | 1922 48th Av | convert partial ground floor space into habitable space - one family rm & one full bathroom. all work at ground floor.Details
convert partial ground floor space into habitable space - one family rm & one full bathroom. all work at ground floor. | $38,000 |
| Nov 23, 2015 | Completed final sign-off Sep 2016 | 961 Pacific Av | relocate kitchen, bath, laundry. add master bathroom within current master bedroom. remove living & dining room walls. add roof deck. extensive seismic strengthening. bring rear lightwell walls down to ground floorDetails
relocate kitchen, bath, laundry. add master bathroom within current master bedroom. remove living & dining room walls. add roof deck. extensive seismic strengthening. bring rear lightwell walls down to ground floor | $200,000 |
| May 26, 2015 | Completed final sign-off Dec 2015 | 761 Commercial St | no ext. or interior alterations or additions: remodel (e) resid. apt. and common areas. remodel the kitchen and bathrooms in each of the 5 units. replace the (e) furnaces in the basement. replace (e) water heaters. replace 3 (e) skylights. one new washer and one new dryer in (e) basement storageDetails
no ext. or interior alterations or additions: remodel (e) resid. apt. and common areas. remodel the kitchen and bathrooms in each of the 5 units. replace the (e) furnaces in the basement. replace (e) water heaters. replace 3 (e) skylights. one new washer and one new dryer in (e) basement storage | $155,000 |
| Apr 14, 2015 | Completed final sign-off Nov 2016 | 25 Corona St | remodel (e) kitchen & ocnstruct one new bathroom at 2nd floor. construct one bedroom, laundry room & one full bathroom at ground floor.Details
remodel (e) kitchen & ocnstruct one new bathroom at 2nd floor. construct one bedroom, laundry room & one full bathroom at ground floor. | $48,000 |
| Jun 30, 2014 | Completed final sign-off Feb 2015 | 55 Sylvan Dr | leagalize one bedroom and add a full bathroom on 1st floor. remodel kitchen & bathroom on 2nd floor.Details
leagalize one bedroom and add a full bathroom on 1st floor. remodel kitchen & bathroom on 2nd floor. | $30,000 |
| Apr 16, 2013 | Completed final sign-off Jun 2013 | 110 Loehr St | add rooms & bathroom at ground floor.Details
add rooms & bathroom at ground floor. | $15,000 |
| Aug 26, 2008 | Completed final sign-off Nov 2008 | 32 Sala Tr | rev.to appl.200806265427.reduce scope of work @ gr fl.correct record drawings to indicate permitted recreation rm as pa# 188974.legalize full bath,remove bathtub &install shower stall.install new drywall to garage side of wall separate living area.delete proposed storage area,shewing 1 hr.fire rateDetails
rev.to appl.200806265427.reduce scope of work @ gr fl.correct record drawings to indicate permitted recreation rm as pa# 188974.legalize full bath,remove bathtub &install shower stall.install new drywall to garage side of wall separate living area.delete proposed storage area,shewing 1 hr.fire rate | |
| Jul 11, 2008 | Completed final sign-off May 2009 | 151 Alice B Toklas Pl | remodel extg bathroom and kitchen per plan/alteration crate closet, floor, new fixture, new stair to bedroom, storage room in unit #708Details
remodel extg bathroom and kitchen per plan/alteration crate closet, floor, new fixture, new stair to bedroom, storage room in unit #708 | $25,000 |
| Oct 25, 2007 | Never finaled issued Jan 2008, no final | 1451 12th Av | the project is for 2 story rear yard addition to an existing 3 story, 3 bedrooms single family residence - we will add an additional bedroom/bath, playroom and dining room. also, extending the 2nd floor to enlarge a kitchen and breakfast room.Details
the project is for 2 story rear yard addition to an existing 3 story, 3 bedrooms single family residence - we will add an additional bedroom/bath, playroom and dining room. also, extending the 2nd floor to enlarge a kitchen and breakfast room. | $250,000 |