Back to bathroom remodel contractors
Innovation Plumbing And Rooter
- Based in
- San Francisco
- On San Francisco permits
- Nov 2023 to Sep 2026
- Last 24 months
- 7 permits filed
11 permits since 2000: 4 completed, 6 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 in progress. Typically 14 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2026 | In progress issued Sep 2026 | 2217 Union St | change of occ/use from retail to buisiness (nail salon) - ada upgrade of bathroom. partition of breakroom and storage area, install (n) sink bowl in breakroom, install (n) mechanical ventillationDetails
change of occ/use from retail to buisiness (nail salon) - ada upgrade of bathroom. partition of breakroom and storage area, install (n) sink bowl in breakroom, install (n) mechanical ventillation | $50,000 |
| May 4, 2026 | In progress issued Aug 2026 | 731 Irving St | t.i. comply with nov#: 202649876. provide ada entry way for bathroom, relocate sink to rear of kitchen, remove booths, restore 4' x 4' concrete floor, new hood range.Details
t.i. comply with nov#: 202649876. provide ada entry way for bathroom, relocate sink to rear of kitchen, remove booths, restore 4' x 4' concrete floor, new hood range. | $45,000 |
| Apr 28, 2026 | In progress issued Apr 2026 | 5656 Mission St | residential unit 2nd flr: install shower door, replace cracking tiles in bathroom, install vanity, paint ceiling and walls in bathroom. 7x4 bathroom size. like for like repairs.Details
residential unit 2nd flr: install shower door, replace cracking tiles in bathroom, install vanity, paint ceiling and walls in bathroom. 7x4 bathroom size. like for like repairs. | $1,800 |