Back to bathroom remodel contractors
Innovate Design Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Sep 2013 to Nov 2025
- Last 24 months
- 13 permits filed
67 permits since 2000: 60 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 15 completed. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2025 | Completed final sign-off May 2026 | 2427 43rd Av | kitchen and bathroom remodel in second floor. tub to shower.Details
kitchen and bathroom remodel in second floor. tub to shower. | $45,000 |
| Jun 4, 2025 | Completed final sign-off Mar 2026 | 2259 47th Av | comply w/ nov 202537777: revision to pa # 202505206906 - add half bath at 2/f.Details
comply w/ nov 202537777: revision to pa # 202505206906 - add half bath at 2/f. | $5,000 |
| May 28, 2025 | Completed final sign-off Sep 2025 | 174 Joost Av | install a new en-suite bathroom in the (e) primary bedroom area and reconfigure clothes closetDetails
install a new en-suite bathroom in the (e) primary bedroom area and reconfigure clothes closet | $18,500 |
| May 20, 2025 | Completed final sign-off Mar 2026 | 2259 47th Av | bathroom remodel on second floor in kind, no moving walls. approx. 40 sqft.Details
bathroom remodel on second floor in kind, no moving walls. approx. 40 sqft. | $20,000 |
| Nov 17, 2023 | Completed final sign-off Jan 2024 | 1435 29th Av | remodel one bathroom on second floorDetails
remodel one bathroom on second floor | $13,000 |
| Jul 12, 2022 | Completed final sign-off Jul 2023 | 1621 Lincoln Wy | remodel (e) kitchen, bathroom. add 1 new half bath & remove/replace (e) sheetrock w/ new. all work on 2nd flr.Details
remodel (e) kitchen, bathroom. add 1 new half bath & remove/replace (e) sheetrock w/ new. all work on 2nd flr. | $52,000 |
| May 31, 2022 | Completed final sign-off Oct 2025 | 2100 Noriega St | at 2nd floor, infill (e) open stair & foyer, facing noriega street. remodel / relocate (e) bathroom. at 1st floor, new foyer, new home office & bedrooms.Details
at 2nd floor, infill (e) open stair & foyer, facing noriega street. remodel / relocate (e) bathroom. at 1st floor, new foyer, new home office & bedrooms. | $80,000 |
| Mar 10, 2022 | Completed final sign-off Jul 2022 | 2575 37th Av | 2/f: remodel existing bathroom into 2 separate bathrooms.Details
2/f: remodel existing bathroom into 2 separate bathrooms. | $30,000 |
| Jun 25, 2021 | Completed final sign-off Oct 2021 | 9 Warren Dr | remodel 1 bath on 2nd fl non structuralDetails
remodel 1 bath on 2nd fl non structural | $8,000 |
| Jun 25, 2019 | Completed final sign-off Aug 2019 | 410 23rd Av | unit 2: remodel bathroom 2/f in-kind, 5'x7'Details
unit 2: remodel bathroom 2/f in-kind, 5'x7' | $8,000 |
| Dec 1, 2017 | Completed final sign-off Aug 2018 | 1840 Wawona St | remodel two bathrooms on the 2nd floor.Details
remodel two bathrooms on the 2nd floor. | $14,000 |
| Mar 1, 2016 | Completed final sign-off Sep 2016 | 1355 20th Av | 1)remodel extg bath on 3rd floor. 2)remodel extg kitchen, relocate extg bath on 2nd floor. 3)repair front stairs, 50% or less and upgrade all electricity.Details
1)remodel extg bath on 3rd floor. 2)remodel extg kitchen, relocate extg bath on 2nd floor. 3)repair front stairs, 50% or less and upgrade all electricity. | $42,000 |
| Jan 16, 2015 | Completed final sign-off Apr 2015 | 565 Burnett Av | apt #3: remodel two bathroom in kind.Details
apt #3: remodel two bathroom in kind. | $13,000 |
| May 5, 2014 | Completed final sign-off Sep 2014 | 536 Panorama Dr | remodel main floor, 2 bathroom and 1 kitchen on 2nd floor. no structural work.Details
remodel main floor, 2 bathroom and 1 kitchen on 2nd floor. no structural work. | $30,000 |
| Sep 25, 2013 | Completed final sign-off Sep 2014 | 2325 Vicente St | comply with nov# 201320912-legalize (e) 2 bedroms, a laundry & 1 full bathroom on ground floor per plan. comply with complaint 201320912Details
comply with nov# 201320912-legalize (e) 2 bedroms, a laundry & 1 full bathroom on ground floor per plan. comply with complaint 201320912 | $20,000 |