Back to bathroom remodel contractors
Inishowen Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Sep 2026
- Last 24 months
- 5 permits filed
28 permits since 2000: 20 completed, 3 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2021 | Completed final sign-off Aug 2024 | 4260 Mission St | mandatory soft story retrofit per sfebc ch 4d & 2019 cebc appendix a-4. 3 accessible bathrooms. 2 door actuators per ab05. (commercial portion)Details
mandatory soft story retrofit per sfebc ch 4d & 2019 cebc appendix a-4. 3 accessible bathrooms. 2 door actuators per ab05. (commercial portion) | $32,000 |
| Dec 7, 2017 | Completed final sign-off Apr 2018 | 845 Marina Bl | remodel one bathroom on top level, no change in walls & openings. new tile work, new bathroom fixtures. relocate light fixtures, painting, replace shower valve, shower pan. maher naDetails
remodel one bathroom on top level, no change in walls & openings. new tile work, new bathroom fixtures. relocate light fixtures, painting, replace shower valve, shower pan. maher na | $19,000 |
| Aug 28, 2017 | Completed final sign-off Jan 2018 | 1628 Haight St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $27,000 |
| Apr 7, 2017 | Completed final sign-off Jul 2017 | 3414 California St | bathroom remodel: new shower pan and tile, mixing valve, new floor and wall tile. rmeoving one of the two (e) sinks and install new bidet, paint.Details
bathroom remodel: new shower pan and tile, mixing valve, new floor and wall tile. rmeoving one of the two (e) sinks and install new bidet, paint. | $18,600 |
| Sep 23, 2016 | Completed final sign-off Nov 2019 | 1477 09th Av | adding bathroom, bedroom replace windows flooring. all work at basement level.Details
adding bathroom, bedroom replace windows flooring. all work at basement level. | $30,000 |