Back to bathroom remodel contractors
Imperial Kitchen And Bath Inc
- Based in
- South San Francsico
- On San Francisco permits
- Mar 2012 to Feb 2015
- Last 24 months
- 0 permits filed
27 permits since 2000: 19 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2014 | Completed final sign-off Feb 2015 | 885 Masonic Av | update guest bath: new tile tub surroundm new tile floor, install new vanity. update master bath: replace tub with shower stall, tile shower surround and floor, install new vanity.Details
update guest bath: new tile tub surroundm new tile floor, install new vanity. update master bath: replace tub with shower stall, tile shower surround and floor, install new vanity. | $10,000 |
| Jul 14, 2014 | Completed final sign-off Oct 2014 | 185 Carnelian Wy | bathroom remodel include replace shower pan,tile shower stall,replace vanity,update lighting to high efficancy,install vanity,sensor switch & tile floor. possible window replacement in-kind at bathroom with u-factor not to exceed 0.40. lighting in bathroom remodelling shall comply with cec 150(k)10.Details
bathroom remodel include replace shower pan,tile shower stall,replace vanity,update lighting to high efficancy,install vanity,sensor switch & tile floor. possible window replacement in-kind at bathroom with u-factor not to exceed 0.40. lighting in bathroom remodelling shall comply with cec 150(k)10. | $11,000 |
| Dec 30, 2013 | Never finaled issued Dec 2013, no final | 2530 14th Av | update in-place - no structural work, remodel bath, replace fixtures, new tub surround.Details
update in-place - no structural work, remodel bath, replace fixtures, new tub surround. | $12,000 |
| Dec 23, 2013 | Expired or cancelled cancelled Jan 2026 | 2530 14th Av | updated in place - no structural work. remodel bath: replace fixtures, tub surround. 1st floor levelDetails
updated in place - no structural work. remodel bath: replace fixtures, tub surround. 1st floor level | $12,000 |
| Dec 23, 2013 | Completed final sign-off Jun 2014 | 1835 Franklin St | update in place - no structural work. remodel kitchen - replace cabinets, fixtures and flooring. remodel 2 baths - replace fixtrues, tile tub and shower. same locationDetails
update in place - no structural work. remodel kitchen - replace cabinets, fixtures and flooring. remodel 2 baths - replace fixtrues, tile tub and shower. same location | $40,000 |
| Dec 23, 2013 | Completed final sign-off Jan 2014 | 437 Arkansas St | replace and retexture sheetrock, damged by over flooded toilet, replace tile in the bath. (water damaged repair in kind)Details
replace and retexture sheetrock, damged by over flooded toilet, replace tile in the bath. (water damaged repair in kind) | |
| Nov 13, 2013 | Completed final sign-off Apr 2014 | 20 Gloria Ct | update bath in place, replace bath fixtures, update electrical wiring, new tub & tub surround, 2 new windows-not visible to street. temp glass @ window in tub. no structural work.Details
update bath in place, replace bath fixtures, update electrical wiring, new tub & tub surround, 2 new windows-not visible to street. temp glass @ window in tub. no structural work. | $9,000 |
| Apr 2, 2013 | Completed final sign-off Jun 2013 | 135 Paraiso Pl | bath fixtures replacement, tile shower enclosure 9same place) new shower pan, upgrade 9e) wiring to code, no outlet or switch moves, no changes to walls and openings.Details
bath fixtures replacement, tile shower enclosure 9same place) new shower pan, upgrade 9e) wiring to code, no outlet or switch moves, no changes to walls and openings. | $11,000 |
| Nov 29, 2012 | Completed final sign-off Feb 2013 | 1011 23rd St | unit #4-bathroom fixtures replacement, replace door, install new tile & greenboard. no change on walls & openingsDetails
unit #4-bathroom fixtures replacement, replace door, install new tile & greenboard. no change on walls & openings | $10,000 |
| Nov 29, 2012 | Completed final sign-off Apr 2013 | 1834 Broderick St | bathroom fixture replacement install new shower pan, green board, new tile floor, no change on walls and openingsDetails
bathroom fixture replacement install new shower pan, green board, new tile floor, no change on walls and openings | $10,000 |
| Mar 26, 2012 | Completed final sign-off Jul 2012 | 607 Duncan St | remodel 2-baths & 1-1/2 bath replace fixtures.Details
remodel 2-baths & 1-1/2 bath replace fixtures. | $15,000 |
| Mar 14, 2012 | Completed final sign-off Jun 2012 | 1525 Noe St | bath remodel: change light, toilet vanity fixtures, tub, 2 new circuits, new fan. radiant floor. 64x96=42 1/2 sq ft. lighting must comply with cec 150(k)Details
bath remodel: change light, toilet vanity fixtures, tub, 2 new circuits, new fan. radiant floor. 64x96=42 1/2 sq ft. lighting must comply with cec 150(k) | $12,919 |