Back to bathroom remodel contractors
Igor Kurikov
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Mar 2025
- Last 24 months
- 3 permits filed
48 permits since 2000: 43 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2025 | Completed final sign-off Jun 2025 | 52 Buena Vista Tr | remove all(e) finishes from both bathrooms on the second floor. install new vanities, new bathrooms, new toilets, new cabinests, new in kind windows (not street visible). new tile throughout. new plumbing fixtures to remain at the same location. no wall demolition, construction or electrical work.Details
remove all(e) finishes from both bathrooms on the second floor. install new vanities, new bathrooms, new toilets, new cabinests, new in kind windows (not street visible). new tile throughout. new plumbing fixtures to remain at the same location. no wall demolition, construction or electrical work. | $160,000 |
| May 31, 2022 | Completed final sign-off Jan 2023 | 52 Buena Vista Tr | revision to permit #202203210398. remove scope of work to remodel 2 extg bathrooms on the 2nd floor.Details
revision to permit #202203210398. remove scope of work to remodel 2 extg bathrooms on the 2nd floor. | |
| Mar 21, 2022 | Never finaled issued Mar 2022, no final | 52 Buena Vista Tr | remodel (e) kitchen, (2) (e) bathrooms on 2/f, (e) master bathroom, replace (6) windows & (1) patio door on the rear facade @ 1/fDetails
remodel (e) kitchen, (2) (e) bathrooms on 2/f, (e) master bathroom, replace (6) windows & (1) patio door on the rear facade @ 1/f | $70,000 |
| Aug 11, 2021 | Completed final sign-off Feb 2022 | 149 Wool St | bathroom remodel. new vanity. new faucets, tiles installation, new lights, painting walls, ceiling and new accesories.Details
bathroom remodel. new vanity. new faucets, tiles installation, new lights, painting walls, ceiling and new accesories. | $20,000 |
| Mar 20, 2019 | Expired or cancelled expired Sep 2024 | 814 Stanyan St | new bathroom, shower, vanity, toiler, recessed lights, sconces, tiling, new non load bearing partition w/pocket door, new closet, new dropped ceilingDetails
new bathroom, shower, vanity, toiler, recessed lights, sconces, tiling, new non load bearing partition w/pocket door, new closet, new dropped ceiling | $50,000 |
| May 18, 2018 | Completed final sign-off Oct 2018 | 2147 Greenwich St | interior remodel to add a bathroom at top floor, with a new skylight & 1 solartubeDetails
interior remodel to add a bathroom at top floor, with a new skylight & 1 solartube | $15,000 |
| Jun 23, 2017 | Completed final sign-off Nov 2017 | 34 Lloyd St | bathroom and kitchen remodeling. remove extg cabinets. install the new ones according to plan. install on demand water heater after removing extg tank, provide d/w. install new toilet, wall mounted sink and new tub in extg locations.Details
bathroom and kitchen remodeling. remove extg cabinets. install the new ones according to plan. install on demand water heater after removing extg tank, provide d/w. install new toilet, wall mounted sink and new tub in extg locations. | $17,000 |
| Apr 10, 2017 | Completed final sign-off Oct 2017 | 1259 Dolores St | convert existing closet into bathroom. add toilet, sink and showerDetails
convert existing closet into bathroom. add toilet, sink and shower | $11,000 |
| Aug 29, 2014 | Completed final sign-off Dec 2014 | 140 Quintara St | master bedroom suite remodel including bathroom, bedroom, closet & office space, no increase in square footage.Details
master bedroom suite remodel including bathroom, bedroom, closet & office space, no increase in square footage. | $75,000 |
| Nov 17, 2011 | Completed final sign-off Oct 2012 | 75 Starview Wy | add 3 new rooms-1 bedroom w/closet, study w/closet & family room. add 1 full bathroom, repl rear windows & sliding door. new lights & outlets. move (e) watwer heater & furnace to garage. new insulation & 5/8" rock. all load bearing walls to remain & finished. new floorsDetails
add 3 new rooms-1 bedroom w/closet, study w/closet & family room. add 1 full bathroom, repl rear windows & sliding door. new lights & outlets. move (e) watwer heater & furnace to garage. new insulation & 5/8" rock. all load bearing walls to remain & finished. new floors | $40,000 |
| Jun 1, 2010 | Completed final sign-off Oct 2013 | 257 States St | kitchen and 2 bathrooms remodelling, drop ceilings in kitchen, corridor and bath rooms. new electrical, new recessed lights, new insulation, new fixtures and faucets, new appliancesDetails
kitchen and 2 bathrooms remodelling, drop ceilings in kitchen, corridor and bath rooms. new electrical, new recessed lights, new insulation, new fixtures and faucets, new appliances | $50,000 |
| Apr 30, 2007 | Completed final sign-off Apr 2008 | 375 28th St | extg non load bearing interior hallway bathroom partition will be removed and new partion built 9 ft away from exterior wall into the hallway to enlarge remodeled bathroom. all extg interior of bathroom demolished to allow for remodel. new insulation, new sheet rock, new tile on floor, new fixturesDetails
extg non load bearing interior hallway bathroom partition will be removed and new partion built 9 ft away from exterior wall into the hallway to enlarge remodeled bathroom. all extg interior of bathroom demolished to allow for remodel. new insulation, new sheet rock, new tile on floor, new fixtures | $25,000 |
| Dec 15, 2005 | Completed final sign-off Apr 2007 | 2125 Beach St | remodeling (e) 2/f (add bathroom,remodel kitchen,add washer/dryer).Details
remodeling (e) 2/f (add bathroom,remodel kitchen,add washer/dryer). | $30,000 |