Back to bathroom remodel contractors
Ideal Carpentry** See Contractor's Note*
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2021
- Last 24 months
- 0 permits filed
255 permits since 2000: 206 completed, 23 never finaled, 26 expired or cancelled.
Of the 23 never-finaled permits, 3 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 25 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 79 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2021 | Completed final sign-off Aug 2021 | 1207 Clayton St | remodel 1 bathroom upstairs: new tub, toilet, vanity, new tile surround. no wall removal.Details
remodel 1 bathroom upstairs: new tub, toilet, vanity, new tile surround. no wall removal. | $20,000 |
| Jan 6, 2021 | Completed final sign-off Jun 2021 | 4059 19th St | one kitchen and one bathroom remodel. same layout. no new wall and no existing wall replacement. all plumbing fixtures remain at same location. new lighting in kitchen and bathroom. remodel shall comply with cec 150kDetails
one kitchen and one bathroom remodel. same layout. no new wall and no existing wall replacement. all plumbing fixtures remain at same location. new lighting in kitchen and bathroom. remodel shall comply with cec 150k | $75,000 |
| Jul 5, 2019 | Completed final sign-off Dec 2019 | 645 Webster St | bathroom remodel: upstairs bathroom & half bathroom. toilet in kind. no moving of walls or doorsDetails
bathroom remodel: upstairs bathroom & half bathroom. toilet in kind. no moving of walls or doors | $15,000 |
| Apr 23, 2019 | Completed final sign-off Aug 2019 | 666 15th Av | second flr - proposed to remodel one full bath and add one full master bath as shown on plansDetails
second flr - proposed to remodel one full bath and add one full master bath as shown on plans | $30,000 |
| Sep 18, 2017 | Completed final sign-off Nov 2017 | 25 Raleigh Av | remodel existing bathroom. all fixtures remain same location. no structural work.Details
remodel existing bathroom. all fixtures remain same location. no structural work. | $15,000 |
| Jul 19, 2017 | Completed final sign-off Oct 2017 | 1260 17th Av | apt #3: kitchen and bathroom remodel, same in kind. relocate electrical panel.Details
apt #3: kitchen and bathroom remodel, same in kind. relocate electrical panel. | $30,000 |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 158 Desmond St | bathroom remodel, new tile new electrical light fan/light & plug, new sheetrock, & tileDetails
bathroom remodel, new tile new electrical light fan/light & plug, new sheetrock, & tile | $8,500 |
| Aug 18, 2015 | Completed final sign-off Nov 2015 | 3184 Mission St | remodel existing bathroom.Details
remodel existing bathroom. | $12,000 |
| Mar 30, 2015 | Completed final sign-off May 2015 | 969 Hayes St | unit #3: bathroom remodel, no structural work, no wall modification; finishes & fixtures; maher n/aDetails
unit #3: bathroom remodel, no structural work, no wall modification; finishes & fixtures; maher n/a | $15,000 |
| Oct 27, 2014 | Completed final sign-off Dec 2014 | 2020 Bush St | two kitchens & two bathrooms remodel. replace kitchen cabinets, countertops & appliances in same location. replace tub & faucet & vanity & tile in same location in both units.Details
two kitchens & two bathrooms remodel. replace kitchen cabinets, countertops & appliances in same location. replace tub & faucet & vanity & tile in same location in both units. | $35,000 |
| Sep 26, 2014 | Completed final sign-off Jan 2015 | 1060 Fulton St | bathroom remodel at third floor and framing decay repair at bathroom area per plan.Details
bathroom remodel at third floor and framing decay repair at bathroom area per plan. | $9,500 |
| Sep 2, 2014 | Completed final sign-off Jan 2015 | 1060 Fulton St | remodel 1st floor bathroom - install new jacuzzi tub, shower and vanity sinkDetails
remodel 1st floor bathroom - install new jacuzzi tub, shower and vanity sink | $16,000 |
| Jun 28, 2013 | Completed final sign-off Feb 2014 | 243 Munich St | interior alteratoins including kitchen, bathroom, lateral strengthening of garage level.Details
interior alteratoins including kitchen, bathroom, lateral strengthening of garage level. | $30,000 |
| Mar 6, 2012 | Completed final sign-off May 2012 | 307 Lakeview Av | revision to appl # 201201041646. per request by inspector to provide plans to show 2 existing storage rooms & 1 full bathroom.Details
revision to appl # 201201041646. per request by inspector to provide plans to show 2 existing storage rooms & 1 full bathroom. | $7,000 |
| Jul 14, 2010 | Completed final sign-off Sep 2010 | 143 Buchanan St | work on #143 only - remodel bathroom , new tub, new tile, new vanity, reuse same toilet.Details
work on #143 only - remodel bathroom , new tub, new tile, new vanity, reuse same toilet. | $8,000 |
| Sep 2, 2008 | Completed final sign-off Nov 2008 | 135 Red Rock Wy | kitchen + bath remodel. replace cabinets in same location, bathroom replace tub tile surround + shower faucet. lighting shall comply with t-24 lighting measure meets if applicable.Details
kitchen + bath remodel. replace cabinets in same location, bathroom replace tub tile surround + shower faucet. lighting shall comply with t-24 lighting measure meets if applicable. | $23,138 |
| Nov 16, 2007 | Completed final sign-off Jan 2008 | 1434 Plymouth Av | bathroom remodel shower stall toilet + ped sink and tile work. approx. 80 sqft of tile work.Details
bathroom remodel shower stall toilet + ped sink and tile work. approx. 80 sqft of tile work. | $12,000 |
| Aug 17, 2007 | Never finaled issued Aug 2007, no final | 12 Broderick St | bathroom remodel no structuralDetails
bathroom remodel no structural | $10,000 |
| Jan 25, 2007 | Completed final sign-off Jun 2007 | 1335 Stanyan St | reinstall tile w/bathroom floor, shower stall, vanily sink + top. repair flood damage in kind: new shower faucet new vinye pan motor floots. install new furnice in kind. replace (e) plugs + switches. replace damage sheetrock in lower floor rooms and in kitchen living rm hallway. replace trim baseDetails
reinstall tile w/bathroom floor, shower stall, vanily sink + top. repair flood damage in kind: new shower faucet new vinye pan motor floots. install new furnice in kind. replace (e) plugs + switches. replace damage sheetrock in lower floor rooms and in kitchen living rm hallway. replace trim base | $40,000 |
| Oct 10, 2006 | Completed final sign-off Oct 2006 | 102 Edinburgh St | bathroom remodel in unit3102. remove tub and tile and tub + shower faucet. remove tile floor. install new tub and shower faucet. install new hardibacker + 4x4 tile on walls and 12s12 tile on floor. no structural.Details
bathroom remodel in unit3102. remove tub and tile and tub + shower faucet. remove tile floor. install new tub and shower faucet. install new hardibacker + 4x4 tile on walls and 12s12 tile on floor. no structural. | $6,000 |
| Aug 22, 2006 | Completed final sign-off Sep 2006 | 401 Brunswick St | to address complaint #200669726 & 200671009. take out kitchen & bathroom.Details
to address complaint #200669726 & 200671009. take out kitchen & bathroom. | $2,000 |
| Dec 14, 2005 | Completed final sign-off Jun 2006 | 1537 06th Av | comply with nov 3200511077534. remodel kitchen cabinets, floor, countertop. redo electrical, re-tile bathrooms, cahnge toilets, sinks, insullation + sheetrock. no structural.Details
comply with nov 3200511077534. remodel kitchen cabinets, floor, countertop. redo electrical, re-tile bathrooms, cahnge toilets, sinks, insullation + sheetrock. no structural. | $12,500 |
| Aug 3, 2005 | Completed final sign-off Dec 2005 | 703 San Bruno Av | kitchen & bathroom work, remodel kitchen replace cabs, countertop flooring walls & ceiling w/ne 5/8Details
kitchen & bathroom work, remodel kitchen replace cabs, countertop flooring walls & ceiling w/ne 5/8 | $22,000 |
| Sep 23, 2004 | Completed final sign-off Mar 2005 | 734 Ashbury St | remodel kitchen,bathroom,laundry closet,replace cabinets,sink,stove,frige.bathroom-new shower pan &Details
remodel kitchen,bathroom,laundry closet,replace cabinets,sink,stove,frige.bathroom-new shower pan & | $25,000 |
| Nov 13, 2003 | Expired or cancelled expired Jun 2004 | 351 Santa Ana Av | four replacement window, not visible in front, kitchen remodel, bathroom remodelDetails
four replacement window, not visible in front, kitchen remodel, bathroom remodel | $25,000 |
| Jun 20, 2003 | Completed final sign-off Nov 2003 | 414 18th Av | kitchen & bathrm remodel; add a new full bath on bedrm closetDetails
kitchen & bathrm remodel; add a new full bath on bedrm closet | $45,000 |
| Nov 25, 2002 | Completed final sign-off Feb 2003 | 529 Dellbrook Av | add bathroom on g/fDetails
add bathroom on g/f | $5,500 |
| Aug 8, 2000 | Expired or cancelled expired Feb 2001 | 51 Rae Av | bathroom remodeling, sheetrock tile, toilet tub, vanity cabinets, replace windowsDetails
bathroom remodeling, sheetrock tile, toilet tub, vanity cabinets, replace windows | $7,500 |