Back to bathroom remodel contractors
Iberia Woodworks
- Based in
- Santa Cruz
- On San Francisco permits
- Aug 2012 to Sep 2015
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 11 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2015 | Never finaled issued Oct 2015, no final | 1529 Treat Av | develop new residential unit within (e) basment area. add 1 new bath & kitchen. replace (e) roof deck @ rear & add 1 hr wall @ property line. no structural work (all structural & seismic strengthening under issued pa 2015-0403-2818Details
develop new residential unit within (e) basment area. add 1 new bath & kitchen. replace (e) roof deck @ rear & add 1 hr wall @ property line. no structural work (all structural & seismic strengthening under issued pa 2015-0403-2818 | $153,000 |
| Aug 19, 2015 | Completed final sign-off Jun 2016 | 908 Shotwell St | remodel kitchen & 2 baths, reframe bedroom on main level, add bay, add interior stair case, add/replace 3 windows, front & rear door. new siding on front and rear north wall.Details
remodel kitchen & 2 baths, reframe bedroom on main level, add bay, add interior stair case, add/replace 3 windows, front & rear door. new siding on front and rear north wall. | $60,000 |
| Jun 17, 2015 | Completed final sign-off Nov 2015 | 643 Anderson St | develop existing 1st fl interior area. add new bedroom and bath. 1 hour separation between garage and all habitable areas. replace rear window and door. no exterior expansion. no structural changes.Details
develop existing 1st fl interior area. add new bedroom and bath. 1 hour separation between garage and all habitable areas. replace rear window and door. no exterior expansion. no structural changes. | $25,000 |
| Aug 3, 2012 | Completed final sign-off Mar 2013 | 945 Corbett Av | bathroom remodel - (2) bathrooms, new floors, vanitys, counter tops, shower enclosures, kitchen: new counter top - cabinets, repplacing removal of carpeting and install of wood floors - no lighting, no plumbing work.Details
bathroom remodel - (2) bathrooms, new floors, vanitys, counter tops, shower enclosures, kitchen: new counter top - cabinets, repplacing removal of carpeting and install of wood floors - no lighting, no plumbing work. | $7,000 |