Ian Smith Systems
- Based in
- Redwood City
- On San Francisco permits
- Feb 2003 to Feb 2005
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2005 | Completed final sign-off Feb 2005 | 1585 15th Av | replace old gas furnace to comparable size 80 percent efficient using existing gas & electrical insuDetails
replace old gas furnace to comparable size 80 percent efficient using existing gas & electrical insu | $4,500 |
| Apr 22, 2003 | Completed final sign-off Aug 2003 | 363 San Benito Wy | addendum to pa 200302268316-termite or rot crossed the plate line into the walls in several areas, tDetails
addendum to pa 200302268316-termite or rot crossed the plate line into the walls in several areas, t | $18,000 |
| Feb 26, 2003 | Completed final sign-off Aug 2003 | 363 San Benito Wy | peel back same stucco to access & replace rotter under pinning, carsidering adding. some chemical aDetails
peel back same stucco to access & replace rotter under pinning, carsidering adding. some chemical a | $30,000 |