Back to bathroom remodel contractors
Iaconi Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Jul 2024
- Last 24 months
- 0 permits filed
23 permits since 2000: 21 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 3 days from filing to permit and 385 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2021 | Completed final sign-off Mar 2023 | 365 Dellbrook Av | interior remodel to add a bedroom, family room, and 2 baths to g/f. replace (e) interior stairs. remove bath at 2/f. add windows at sides of house. add doors & window at rear. add plywood to south of bedroom 1 and north of bedroom 2. (e) foundation will remain with (e) slab being replaced at rearDetails
interior remodel to add a bedroom, family room, and 2 baths to g/f. replace (e) interior stairs. remove bath at 2/f. add windows at sides of house. add doors & window at rear. add plywood to south of bedroom 1 and north of bedroom 2. (e) foundation will remain with (e) slab being replaced at rear | $125,000 |
| Dec 2, 2020 | Expired or cancelled cancelled Jan 2023 | 63 Brewster St | move doorway, new window, and sliding glass door. remove (e) bathroom, rebuild bathroom, update bathroom outlets, lights, laundry room outlets, and plumbing. rear landing and (n) door location. non-street facingDetails
move doorway, new window, and sliding glass door. remove (e) bathroom, rebuild bathroom, update bathroom outlets, lights, laundry room outlets, and plumbing. rear landing and (n) door location. non-street facing | $46,000 |
| Oct 24, 2014 | Completed final sign-off Mar 2015 | 59 Brewster St | interior remodel of existing full bath, bring upto code, addition of new full bathroom, garage level and legalize existing home office/guest bedroom per plans. replace rear window and door, not visable from street.Details
interior remodel of existing full bath, bring upto code, addition of new full bathroom, garage level and legalize existing home office/guest bedroom per plans. replace rear window and door, not visable from street. | $45,000 |