Back to bathroom remodel contractors
I T Tile And Grout Master
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Mar 2026
- Last 24 months
- 5 permits filed
12 permits since 2000: 11 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 in progress. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2026 | Completed final sign-off May 2026 | 690 40th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $25,000 |
| Oct 9, 2025 | In progress issued Oct 2025 | 425 01st St | primary bathroom remodel in-kind no structural changes. new plumbing fixtures, 1 shower pan, install one light. guest bathroom: retiel the shower and 1 shower pan.Details
primary bathroom remodel in-kind no structural changes. new plumbing fixtures, 1 shower pan, install one light. guest bathroom: retiel the shower and 1 shower pan. | $45,000 |
| Sep 26, 2025 | Completed final sign-off Mar 2026 | 915 Vienna St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $24,796 |
| Jul 14, 2025 | Completed final sign-off Sep 2025 | 1235 16th Av | unit 5: bathrom remodel - remove the tub, plumbing fixtures, tile from the walls and floor. install (1) showerpan, new plumbing fixtures. tile and grout the shower stall, bathroom floor and wainscoting.Details
unit 5: bathrom remodel - remove the tub, plumbing fixtures, tile from the walls and floor. install (1) showerpan, new plumbing fixtures. tile and grout the shower stall, bathroom floor and wainscoting. | $18,318 |
| May 6, 2025 | Completed final sign-off Apr 2026 | 1857 Hyde St | 2 bathrooms remodel: convert tub to shower in 1855; tub remains in 1857, vanity replacement in both. (electrical was pulled under different permit for whole units)Details
2 bathrooms remodel: convert tub to shower in 1855; tub remains in 1857, vanity replacement in both. (electrical was pulled under different permit for whole units) | $25,000 |
| Dec 17, 2022 | Completed final sign-off Mar 2023 | 529 Wildwood Wy | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $13,682 |
| Aug 31, 2022 | Completed final sign-off Dec 2022 | 190 Newton St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Feb 10, 2022 | Completed final sign-off Sep 2022 | 830 Lake St | unit #3: remodel 1 bathroom in kind, no structural, no changes to walls or openings, new tub shower, new shower valve rough in. new shower fixtures, tile on the walls and floor.Details
unit #3: remodel 1 bathroom in kind, no structural, no changes to walls or openings, new tub shower, new shower valve rough in. new shower fixtures, tile on the walls and floor. | $11,000 |
| Nov 29, 2021 | Completed final sign-off Mar 2022 | 830 Lake St | unit #5: bathroom remodel:retile the stall shower & bathroom floor,install new shower,install electrical floor heating system (max 3kw capacity with controls).no structural work.Details
unit #5: bathroom remodel:retile the stall shower & bathroom floor,install new shower,install electrical floor heating system (max 3kw capacity with controls).no structural work. | $9,000 |
| Nov 18, 2021 | Completed final sign-off Apr 2022 | 425 01st St | unit 5104 - remodel (2) bathrooms, replace tile on both bathrooms, remove (1) non-struct wall, replace (e) lights w/ led, remove (1) tub & capoff plumbing. install (n) plumbing fixture on both bathroom, install (1) pocket door in bathroom, install (1) pocket door in living rm, minor drywall repairDetails
unit 5104 - remodel (2) bathrooms, replace tile on both bathrooms, remove (1) non-struct wall, replace (e) lights w/ led, remove (1) tub & capoff plumbing. install (n) plumbing fixture on both bathroom, install (1) pocket door in bathroom, install (1) pocket door in living rm, minor drywall repair | $39,000 |
| Apr 20, 2021 | Completed final sign-off Apr 2022 | 4150 17th St | remodel 2 bathrooms in-kind (1 on 2/f & 1 on g/f). no structural. no changes to walls or openings. new curbed shower, toilet, double vanity. all new fixtures, finsiehs, wall to floor tile.Details
remodel 2 bathrooms in-kind (1 on 2/f & 1 on g/f). no structural. no changes to walls or openings. new curbed shower, toilet, double vanity. all new fixtures, finsiehs, wall to floor tile. | $29,000 |
| Apr 22, 2019 | Completed final sign-off May 2019 | 2412 40th Av | remove (e) shower pan & bathroom floor, instlal new shower pan, tile, grout the shower pan & bathroom floor. fix any missing grou on shower walls. to comply with his nov #201945502Details
remove (e) shower pan & bathroom floor, instlal new shower pan, tile, grout the shower pan & bathroom floor. fix any missing grou on shower walls. to comply with his nov #201945502 | $6,850 |