I E C Electrical Contractors Inc
- Based in
- Simi Valley
- On San Francisco permits
- Aug 2016 to Oct 2026
- Last 24 months
- 1 permit filed
5 permits since 2000: 3 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1160 Grant Av | interior alteration with no changes to occupant load and egress routes. interior tenant improvement for existing tenant, wells fargo bank, a new as-atm, new passageway, new welcome touchpoint, interior finishes,and furniture replacement.new structural wal at the teller area.Details
interior alteration with no changes to occupant load and egress routes. interior tenant improvement for existing tenant, wells fargo bank, a new as-atm, new passageway, new welcome touchpoint, interior finishes,and furniture replacement.new structural wal at the teller area. | $135,240 |
| Feb 2, 2023 | Completed final sign-off Mar 2023 | 350 Bay St | decommission space occupied by wells fargo bank (demo of existing non structural interior partitions and ceiling headers. no changes to sprinklers, panels, lights). to return space to original shell condition.Details
decommission space occupied by wells fargo bank (demo of existing non structural interior partitions and ceiling headers. no changes to sprinklers, panels, lights). to return space to original shell condition. | $25,000 |
| Feb 23, 2021 | Never finaled issued Apr 2021, no final | 1750 Fulton St | inside existing lucky store: area of work 690 sq ft. decommission (remove) well fargo in store bank. remove existing interior walls and finishes and partial ceiling area. relocate existing electrical panel and some lighting. soft demo.Details
inside existing lucky store: area of work 690 sq ft. decommission (remove) well fargo in store bank. remove existing interior walls and finishes and partial ceiling area. relocate existing electrical panel and some lighting. soft demo. | $50,000 |
| Sep 3, 2019 | Completed final sign-off Dec 2019 | 1595 Sloat Bl | ti 200sf conference room- wall partitions - new finishes - hvac diffusers.Details
ti 200sf conference room- wall partitions - new finishes - hvac diffusers. | $30,000 |
| Aug 17, 2016 | Completed final sign-off Mar 2017 | 832 Sutter St | new walk up atm in (e) building storefrontDetails
new walk up atm in (e) building storefront | $9,745 |