I Build And Design
- Based in
- Oakland
- On San Francisco permits
- Apr 2008 to Oct 2016
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2016 | Completed final sign-off Dec 2016 | 747 32nd Av | to comply with nov 201622515, items 2 & 3. replace and repair damaged deck and stairs. remove screen and do a railingDetails
to comply with nov 201622515, items 2 & 3. replace and repair damaged deck and stairs. remove screen and do a railing | $5,000 |
| Jul 21, 2011 | Completed final sign-off Feb 2012 | 1455 27th Av | renovate (e) bathroom and add new full bathroom. replace skylight, install new shower, new bath tub, lighting, ventilation and vanities. all work on second floorDetails
renovate (e) bathroom and add new full bathroom. replace skylight, install new shower, new bath tub, lighting, ventilation and vanities. all work on second floor | $15,000 |
| Apr 29, 2008 | Completed final sign-off May 2008 | 28 Norton St | revision to 200707207372 r1 application measurement modification and verification by inspector on site. 13'0"x19'6" horizontal addition and mech. plan checker to review title 24 for addition.Details
revision to 200707207372 r1 application measurement modification and verification by inspector on site. 13'0"x19'6" horizontal addition and mech. plan checker to review title 24 for addition. |