Back to bathroom remodel contractors
Huynh's Construction Co
- Based in
- Concord
- On San Francisco permits
- Oct 2014 to Dec 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2018 | Completed final sign-off Apr 2019 | 779 18th Av | kitchen and bath remodel in-kindDetails
kitchen and bath remodel in-kind | $100,000 |
| Nov 5, 2018 | Completed final sign-off Jan 2019 | 72 Lippard Av | in kind bathroom remodelDetails
in kind bathroom remodel | $30,000 |
| Sep 16, 2016 | Completed final sign-off Mar 2017 | 846 44th Av | remodel of (e) kitchen and bathroom. all fixtures to remain in same locationDetails
remodel of (e) kitchen and bathroom. all fixtures to remain in same location | $33,000 |
| Aug 5, 2015 | Completed final sign-off Oct 2015 | 27 Mallorca Wy | remodel 1 bath, 1 half bath and paint, replace existing deck doorDetails
remodel 1 bath, 1 half bath and paint, replace existing deck door | $30,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 120 Stanyan St | remodel 2 bathrooms and change 4 windows on the top level, front of the building.Details
remodel 2 bathrooms and change 4 windows on the top level, front of the building. | $20,000 |