Back to bathroom remodel contractors
Huts And Castles A Construction Co., Inc
- Based in
- Novato
- On San Francisco permits
- Oct 2000 to Sep 2021
- Last 24 months
- 0 permits filed
40 permits since 2000: 22 completed, 10 never finaled, 8 expired or cancelled.
Of the 10 never-finaled permits, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 9 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2018 | Completed final sign-off Nov 2020 | 2328 Vallejo St | remodel to (e) apt(r-2) work in unit 1 only. primarily interior fixts & finishes. 1 bathroom to be removed and replace with w/d rm. structrual work at (e) slab and wall header. new entry door and vestibule & exterior paving. replace (e) rear deck guardrail in kind. in filling (2) non-visible windowsDetails
remodel to (e) apt(r-2) work in unit 1 only. primarily interior fixts & finishes. 1 bathroom to be removed and replace with w/d rm. structrual work at (e) slab and wall header. new entry door and vestibule & exterior paving. replace (e) rear deck guardrail in kind. in filling (2) non-visible windows | $135,000 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 280 Frederick St | remodel 2 bathrooms & 1 kitchen in kind. replace 5 windows in kind. work not visible from streetDetails
remodel 2 bathrooms & 1 kitchen in kind. replace 5 windows in kind. work not visible from street | $25,000 |
| May 19, 2016 | Completed final sign-off Apr 2017 | 666 Cayuga Av | interior remodel on 2nd floor including the relocation of the kitchen, conversion of infill patio space to habitable square footage and the addition of a hall bathroom.Details
interior remodel on 2nd floor including the relocation of the kitchen, conversion of infill patio space to habitable square footage and the addition of a hall bathroom. | $75,000 |
| Sep 2, 2015 | Never finaled issued Sep 2015, no final | 3772 26th St | both units: replacment in-kind, 2 bathroom, 2 kitchen, new angle stops, new electrical outlets throughout, new appliances, new lights, fixtures, new ductwork where applicable, electrical & plumbing under seperate permits, work on 2/f & 3/f.Details
both units: replacment in-kind, 2 bathroom, 2 kitchen, new angle stops, new electrical outlets throughout, new appliances, new lights, fixtures, new ductwork where applicable, electrical & plumbing under seperate permits, work on 2/f & 3/f. | $125,000 |
| Jul 24, 2015 | Completed final sign-off Mar 2019 | 212 27th St | extend lower basement level to add workout rm, laundry rm, guest bedrom & bath. extend 1st fl to rear to add larger kitchen, family rom & 1/2 bath. extend 2nd fl @ rear to add 1 bedroom & bath. add new 3rd floor with office & bath plus outside deck.Details
extend lower basement level to add workout rm, laundry rm, guest bedrom & bath. extend 1st fl to rear to add larger kitchen, family rom & 1/2 bath. extend 2nd fl @ rear to add 1 bedroom & bath. add new 3rd floor with office & bath plus outside deck. | $750,000 |
| Jul 14, 2014 | Completed final sign-off Nov 2014 | 430 Hayes St | #301: close 4 existing windows with 1 hr construction. add 1 bathroom, add 2 recessed lights in living/dining area.Details
#301: close 4 existing windows with 1 hr construction. add 1 bathroom, add 2 recessed lights in living/dining area. | $7,000 |
| Jul 14, 2014 | Completed final sign-off Nov 2014 | 430 Hayes St | #101: close 4 existing windows with 1 hr construction. add 1 bathroom, add 2 recessed lights in living/dining area. build 1 hr shaft for venting to roof.Details
#101: close 4 existing windows with 1 hr construction. add 1 bathroom, add 2 recessed lights in living/dining area. build 1 hr shaft for venting to roof. | $7,000 |
| Jul 14, 2014 | Completed final sign-off Nov 2014 | 430 Hayes St | #201: close 4 existing windows with 1 hr construction. add 1 bathroom, add 2 recessed lights in living/dining area. build 1 hr shaft for venting to roof.Details
#201: close 4 existing windows with 1 hr construction. add 1 bathroom, add 2 recessed lights in living/dining area. build 1 hr shaft for venting to roof. | $7,000 |
| May 7, 2014 | Completed final sign-off Jul 2014 | 1450 Post St | unit 808: relocate kitchen, remove bathroom.Details
unit 808: relocate kitchen, remove bathroom. | $45,000 |
| Jan 28, 2014 | Completed final sign-off Sep 2014 | 373 Lombard St | replace 1 tub with shower, guest bathroom , replace kitchen cabinets & counters -in kindDetails
replace 1 tub with shower, guest bathroom , replace kitchen cabinets & counters -in kind | $30,000 |
| Aug 20, 2013 | Never finaled issued Aug 2013, no final | 4059 26th St | remodel bathroom & kitchen, change 2 windows in kind @ back wall, infill 2 (e) window. all work on 2nd floor only.Details
remodel bathroom & kitchen, change 2 windows in kind @ back wall, infill 2 (e) window. all work on 2nd floor only. | $60,000 |
| Jun 13, 2011 | Completed final sign-off Jun 2012 | 373 Lombard St | unit #502 - remodel 3 bathrooms, change shower valves, replace as existing. remodel kitchen, replace to match existing, upgrade lighting lighting, repair framing (installed incorrectly per existing plan). condo 4-story with garage, wood frameDetails
unit #502 - remodel 3 bathrooms, change shower valves, replace as existing. remodel kitchen, replace to match existing, upgrade lighting lighting, repair framing (installed incorrectly per existing plan). condo 4-story with garage, wood frame | $70,000 |
| Oct 13, 2000 | Expired or cancelled expired Nov 2002 | 1934 10th Av | addition 14 x 25 wood deck at 2nd story add living rm at 1st story add 2 bdrm and bath at basementDetails
addition 14 x 25 wood deck at 2nd story add living rm at 1st story add 2 bdrm and bath at basement | $95,000 |