Back to bathroom remodel contractors
Husted Construction
- Based in
- Daly City
- On San Francisco permits
- Jan 2000 to Mar 2026
- Last 24 months
- 1 permit filed
26 permits since 2000: 18 completed, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2013 | Completed final sign-off Jun 2014 | 29 Rausch St | work at 1 & 2/f only. relocate kitchen, convert toilet to bath 2, remodel & reconfigure bath 1, install furnace & assoc. ductwork. replace/relocate tank type water heaters w/tankless type, install lighting switches, recept. replace windww to double pane total of 30 at 1 & 2/f, 3 rescue windows,Details
work at 1 & 2/f only. relocate kitchen, convert toilet to bath 2, remodel & reconfigure bath 1, install furnace & assoc. ductwork. replace/relocate tank type water heaters w/tankless type, install lighting switches, recept. replace windww to double pane total of 30 at 1 & 2/f, 3 rescue windows, | $85,000 |
| Jun 18, 2007 | Completed final sign-off Oct 2007 | 159 08th Av | baths & kitchens (remove all fixtures, cabinet & wall covering only) no lose of (e) kitchen. remodel kitchen & bath under separate.Details
baths & kitchens (remove all fixtures, cabinet & wall covering only) no lose of (e) kitchen. remodel kitchen & bath under separate. | $5,000 |
| Dec 12, 2002 | Completed final sign-off Apr 2003 | 1000 North Point St | replace kitchen cabinets & fixtures, replace bathroom cabinets & fixtures no change to flr plan or wDetails
replace kitchen cabinets & fixtures, replace bathroom cabinets & fixtures no change to flr plan or w | $25,000 |