Back to bathroom remodel contractors
Hunter Dale Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Jun 2026
- Last 24 months
- 12 permits filed
42 permits since 2000: 25 completed, 7 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 5 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 92 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2026 | In progress issued May 2026 | 889 Elizabeth St | replace finishes in 3 bathrooms and 1 tub to shower conversion. 1 powder room remodel, new tiles, fixtures. new counter tops and fixtures in kitchen.Details
replace finishes in 3 bathrooms and 1 tub to shower conversion. 1 powder room remodel, new tiles, fixtures. new counter tops and fixtures in kitchen. | $150,000 |
| Aug 29, 2022 | Never finaled issued Jun 2023, no final | 284 Page St | interior remodel to (e) bathrooms & kitchen. convert unconditioned ground floor into conditioned space: new cabinets, lighting, fixtures, finishes. 2 new patio doors on rear elevation, 1 new skylight. no change to lily st apts.Details
interior remodel to (e) bathrooms & kitchen. convert unconditioned ground floor into conditioned space: new cabinets, lighting, fixtures, finishes. 2 new patio doors on rear elevation, 1 new skylight. no change to lily st apts. | $785,000 |
| May 3, 2022 | Completed final sign-off May 2024 | 2400 Pacheco St | floor 1: create additional habitable area, (2) bedrms, bath, utility, reconstruct stair to flr 2 and maintain garage. flr 2: remodel kitchen/living/dining, (2) bedrms, bath & powder rm. add cantilevered balcony.Details
floor 1: create additional habitable area, (2) bedrms, bath, utility, reconstruct stair to flr 2 and maintain garage. flr 2: remodel kitchen/living/dining, (2) bedrms, bath & powder rm. add cantilevered balcony. | $165,000 |
| Sep 13, 2021 | Completed final sign-off Oct 2022 | 437 Hoffman Av | remodel bathroom @ 3rd fl, add powder rm @ 2nd fl in (e) closet.Details
remodel bathroom @ 3rd fl, add powder rm @ 2nd fl in (e) closet. | $12,000 |
| Jul 21, 2021 | Expired or cancelled expired Apr 2026 | 515 Duboce Av | interior renovations and partitoin changes. fill in 2 story light well. relocate kitchen and baths, and bedrooms. enlarge e rear facade and east light court windows. new skylights. new mep, fixtures, finishes, fittingsDetails
interior renovations and partitoin changes. fill in 2 story light well. relocate kitchen and baths, and bedrooms. enlarge e rear facade and east light court windows. new skylights. new mep, fixtures, finishes, fittings | $300,000 |
| Jun 14, 2021 | Completed final sign-off Aug 2021 | 35 Forest View Dr | to comply w/ nov# 202177125. (n) office, recroom, and bathroom in (e) 1st flr.Details
to comply w/ nov# 202177125. (n) office, recroom, and bathroom in (e) 1st flr. | $20,000 |
| Nov 23, 2020 | Expired or cancelled expired Apr 2026 | 182 Andover St | convert portion of (e) garage to habitable space: new office, media room, relocated bathroom, new doors and interior stairs.Details
convert portion of (e) garage to habitable space: new office, media room, relocated bathroom, new doors and interior stairs. | $74,306 |
| Oct 21, 2020 | Completed final sign-off Nov 2022 | 182 Andover St | replace all vinyl windows in (e) oepnings.englarge wdw in (e) locations non-visible.new skylight in bdrm,remove deck&stairs outside master bdrm,relace ext doors,new closet doors in bdrm,interior remodel of bath,new fixtures, and new landscaping & fence backyard.Details
replace all vinyl windows in (e) oepnings.englarge wdw in (e) locations non-visible.new skylight in bdrm,remove deck&stairs outside master bdrm,relace ext doors,new closet doors in bdrm,interior remodel of bath,new fixtures, and new landscaping & fence backyard. | $56,500 |
| Aug 17, 2020 | Completed final sign-off Apr 2021 | 668 Sanchez St | kitchen & bathroom renovation on 2nd floor. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained, mep maintained. no alteration to windows or doors.Details
kitchen & bathroom renovation on 2nd floor. no walls moved. floor plan to remain unchanged. all (e) adaptable features maintained, mep maintained. no alteration to windows or doors. | $38,000 |
| Dec 18, 2013 | Never finaled issued Nov 2015, no final | 2662 38th Av | vertical addition & horizontal extension to (e) single family home with added bathrooms.Details
vertical addition & horizontal extension to (e) single family home with added bathrooms. | $200,000 |