Back to bathroom remodel contractors
Hung's General Construction
- Based in
- Fremont
- On San Francisco permits
- Feb 2008 to May 2026
- Last 24 months
- 4 permits filed
32 permits since 2000: 22 completed, 3 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2024 | Expired or cancelled expired Apr 2024 | 241 29th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $16,000 |
| Aug 18, 2023 | Completed final sign-off Feb 2024 | 208 Monterey Bl | bathroom: remodel with new shower pan (custom) new flooring, tile wall, faucets, vanity new vent, new toilet kitchen: new cabinets, countertop, applinces, sink, recess lights, new siding front and rear of house, new window, skylights remove and replace all works are to be in-kindDetails
bathroom: remodel with new shower pan (custom) new flooring, tile wall, faucets, vanity new vent, new toilet kitchen: new cabinets, countertop, applinces, sink, recess lights, new siding front and rear of house, new window, skylights remove and replace all works are to be in-kind | $50,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2023 | 1415 34th Av | one bathroom remodeling: replace tub, vanity, faucet, ventalarion foul, wet area tiles, floor tiles. customer made 32" x 36" shower stall. 3 new recess lights.Details
one bathroom remodeling: replace tub, vanity, faucet, ventalarion foul, wet area tiles, floor tiles. customer made 32" x 36" shower stall. 3 new recess lights. | $15,000 |
| Nov 14, 2022 | Completed final sign-off Jan 2023 | 1310 Fillmore St | unit 1004; master bathroom remodeling - custom made shower pan, replace toilet vanity, sink, faucets. ventilation fan, new afci/gfci outlets. in kindDetails
unit 1004; master bathroom remodeling - custom made shower pan, replace toilet vanity, sink, faucets. ventilation fan, new afci/gfci outlets. in kind | $20,000 |
| Sep 26, 2022 | Completed final sign-off Dec 2022 | 1658 41st Av | interior remodel on 2nd floor: remodel exisitng bathroom and add new bathroom.Details
interior remodel on 2nd floor: remodel exisitng bathroom and add new bathroom. | $25,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 1658 41st Av | kitchen remodeling- replace cabinets, countertop, faucets, appliances, light, floorung, switches, and outlets. bathroom remodeling- replace tub, tub door, wet area, tiles, floorng, fauucet, vanity,faucet, light, mirrorDetails
kitchen remodeling- replace cabinets, countertop, faucets, appliances, light, floorung, switches, and outlets. bathroom remodeling- replace tub, tub door, wet area, tiles, floorng, fauucet, vanity,faucet, light, mirror | $35,000 |
| May 24, 2022 | Completed final sign-off Sep 2022 | 1746 45th Av | remodel bathroom: replace flooring, vanity, light, gfci, toilet, paint. replace sheet rock.Details
remodel bathroom: replace flooring, vanity, light, gfci, toilet, paint. replace sheet rock. | $30,000 |
| May 12, 2022 | Completed final sign-off Oct 2022 | 1805 Pine St | unit #1: remodel bathroom, replace tub, vanity & light, plug, new tile,toliet. remodel kitchen, replace cabinets, flooring new tile, sand floor, paint unitDetails
unit #1: remodel bathroom, replace tub, vanity & light, plug, new tile,toliet. remodel kitchen, replace cabinets, flooring new tile, sand floor, paint unit | $18,500 |
| Oct 19, 2020 | Completed final sign-off Oct 2021 | 151 Commonwealth Av | kitchen remodel - replace cabinets, coutnertops, appliances, flooring & lights. bathroom (3) & powder room remodel with new vanity, countertop, faucets, bathtub, shower, flooring, ventilation. replace front windows - street facing. wood windows with true divided lites matching google photo 2019Details
kitchen remodel - replace cabinets, coutnertops, appliances, flooring & lights. bathroom (3) & powder room remodel with new vanity, countertop, faucets, bathtub, shower, flooring, ventilation. replace front windows - street facing. wood windows with true divided lites matching google photo 2019 | $75,000 |
| Jan 22, 2019 | Completed final sign-off Nov 2019 | 2734 42nd Av | remodel kitchen w/ new cabinets & 2 bathrooms. bathrm 48sq ft & 50 sq ft. kitchen 180 sq ft.Details
remodel kitchen w/ new cabinets & 2 bathrooms. bathrm 48sq ft & 50 sq ft. kitchen 180 sq ft. | $57,023 |
| May 25, 2018 | Completed final sign-off Jul 2019 | 2187 28th Av | legalize bathroom on 2nd floor level & add 2 closets in nw master bedroom. add nw master bedroom, master bathroom, media room, 2nd bathroom & storage on the ground level. install new lighting & control through out ground floor. install nw electrical throughout ground fl. remove 4 extg windows onDetails
legalize bathroom on 2nd floor level & add 2 closets in nw master bedroom. add nw master bedroom, master bathroom, media room, 2nd bathroom & storage on the ground level. install new lighting & control through out ground floor. install nw electrical throughout ground fl. remove 4 extg windows on | $60,000 |
| Nov 3, 2017 | Expired or cancelled cancelled Apr 2024 | 2358 18th Av | horizontal addition. two story rear addition to an (e) single family. 2 new bedrooms & 2 new baths.Details
horizontal addition. two story rear addition to an (e) single family. 2 new bedrooms & 2 new baths. | $350,000 |
| Mar 6, 2015 | Completed final sign-off May 2015 | 2074 34th Av | to convert (e) toilet to a master bath, remodel (e) bath and kitchen in 2nd flrDetails
to convert (e) toilet to a master bath, remodel (e) bath and kitchen in 2nd flr | $25,000 |
| Nov 3, 2014 | Completed final sign-off Feb 2016 | 2074 34th Av | convert (e) space in 1/f to 2 bedrooms, 2 baths.Details
convert (e) space in 1/f to 2 bedrooms, 2 baths. | $45,000 |
| Mar 4, 2014 | Never finaled issued Mar 2014, no final | 1566 20th Av | remodel 2 bathrooms on top floor and add ne recessed lighting and wall plugs at 3 bedrooms and hallway. no change on wall, window and doorDetails
remodel 2 bathrooms on top floor and add ne recessed lighting and wall plugs at 3 bedrooms and hallway. no change on wall, window and door | $30,000 |
| Jun 26, 2008 | Completed final sign-off Nov 2008 | 190 Edinburgh St | construction one story rear deck. to add two bedrooms. one full bathroom and one storage on existing ground floor per plan.Details
construction one story rear deck. to add two bedrooms. one full bathroom and one storage on existing ground floor per plan. | $32,000 |
| Feb 22, 2008 | Completed final sign-off Dec 2008 | 1 Hahn St | legalize lower level bedroom, family & bath. install drywall at garage ceiling & walls. install patio door @ 2nd. flr. of rear.Details
legalize lower level bedroom, family & bath. install drywall at garage ceiling & walls. install patio door @ 2nd. flr. of rear. | $18,000 |