Back to bathroom remodel contractors
Hugo Lombera Construction
- Based in
- Hayward
- On San Francisco permits
- Aug 2018 to Aug 2026
- Last 24 months
- 6 permits filed
7 permits since 2000: 4 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 in progress. Typically 0 days from filing to permit and 163 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | In progress filed Aug 2026, not yet issued | 2845 24th St | comply with nov#20045450,201521053: repair guard rail, repair & replace broken windows. replace damaged plumbing & waste lines & supply lines. repair some walls & ceiling in laundry, bedroom, bathroom & kitchen. repair exteriror porch door. add closing device, repair or replace (e) heating units.Details
comply with nov#20045450,201521053: repair guard rail, repair & replace broken windows. replace damaged plumbing & waste lines & supply lines. repair some walls & ceiling in laundry, bedroom, bathroom & kitchen. repair exteriror porch door. add closing device, repair or replace (e) heating units. | $12,000 |
| Mar 19, 2026 | Completed final sign-off Sep 2026 | 2603 Bryant St | remodel kitchen, new layout (new appliances, cabinet),new bathroom to replace (e) on 1st/f, new washer/dryer. replace 3 windows in rear facade on (e) openings, close 1 window on north side. comply with nov#200454500, item#3.Details
remodel kitchen, new layout (new appliances, cabinet),new bathroom to replace (e) on 1st/f, new washer/dryer. replace 3 windows in rear facade on (e) openings, close 1 window on north side. comply with nov#200454500, item#3. | $85,000 |
| Feb 23, 2026 | In progress issued Feb 2026 | 2847 24th St | aka: 2603 bryant street- remove partial wall for exploratory demo; expose original staircase railing. building permit to be applied for later date for in-kind kitchen and bathroom remodel. all removed to be repaired in kind. all interior non street facing. drywall repair inkind.Details
aka: 2603 bryant street- remove partial wall for exploratory demo; expose original staircase railing. building permit to be applied for later date for in-kind kitchen and bathroom remodel. all removed to be repaired in kind. all interior non street facing. drywall repair inkind. | $9,000 |
| Sep 17, 2025 | Completed final sign-off May 2026 | 95 Corwin St | unit 3: bathroom remodel in-kind. (2) lights (1) exhaust fan.Details
unit 3: bathroom remodel in-kind. (2) lights (1) exhaust fan. | $15,000 |
| Aug 25, 2025 | Completed final sign-off Nov 2025 | 95 Corwin St | unit #2: inkind remodel of kitchen and bathroom. add 6 new recessed lights to living room. replace kitchen window in kind, in the existing opening. replace bathroom window in kind and in existing opening.Details
unit #2: inkind remodel of kitchen and bathroom. add 6 new recessed lights to living room. replace kitchen window in kind, in the existing opening. replace bathroom window in kind and in existing opening. | $45,000 |