Huawell Construction Development Group I
- Based in
- San Jose
- On San Francisco permits
- Mar 2018 to Mar 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2019 | Completed final sign-off Sep 2019 | 212 Silliman St | repair/replace damaged wood and stucco on side facade. replace 2nd and 3rd floor front windows (3 total) with aluminum-clad wood, triple casement windows in same rough opening. in-kind replacement of roof and repair/replace portion of rear wall that has dry rot.Details
repair/replace damaged wood and stucco on side facade. replace 2nd and 3rd floor front windows (3 total) with aluminum-clad wood, triple casement windows in same rough opening. in-kind replacement of roof and repair/replace portion of rear wall that has dry rot. | $17,500 |
| Mar 12, 2018 | Completed final sign-off Dec 2018 | 245 Jefferson St | reconfigure interior layout per plan, relocate bar add two rooms. maher n/aDetails
reconfigure interior layout per plan, relocate bar add two rooms. maher n/a | $50,000 |