Housesavers
- Based in
- Sausalito
- On San Francisco permits
- Sep 2006 to Sep 2006
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2006 | Never finaled issued Sep 2006, no final | 1458 Sutter St | repair and partially replace rear building deck/stairs, no chhange to configuration of footage, remove ising 2x6 redwood decking and rail cap from step and deck landing areas: replace decking with new 5/4x6 weeatherbest composite decking attached to existing substucrture with 2.5" coat deck screws,Details
repair and partially replace rear building deck/stairs, no chhange to configuration of footage, remove ising 2x6 redwood decking and rail cap from step and deck landing areas: replace decking with new 5/4x6 weeatherbest composite decking attached to existing substucrture with 2.5" coat deck screws, | $17,400 |