Back to bathroom remodel contractors
House Calls
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Mar 2024
- Last 24 months
- 0 permits filed
11 permits since 2000: 6 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 413 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2017 | Completed final sign-off Sep 2017 | 2322 Union St | replace (e) kitchen, maintain (e) layout, install recessed lights, replace 2 (e) bathroom, maintain (e) layout, install recessed lights & vent fanDetails
replace (e) kitchen, maintain (e) layout, install recessed lights, replace 2 (e) bathroom, maintain (e) layout, install recessed lights & vent fan | $30,000 |
| Oct 27, 2015 | Completed final sign-off Oct 2017 | 945 Corbett Av | bathroom remodel: remove 2 layers of floor tile, remove tub and wall tile, move toilet approx 12". install walkin shower. reconfigure plmg for 2 shower heads and hand held.Details
bathroom remodel: remove 2 layers of floor tile, remove tub and wall tile, move toilet approx 12". install walkin shower. reconfigure plmg for 2 shower heads and hand held. | $14,500 |