Back to bathroom remodel contractors
Hough Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jun 2022
- Last 24 months
- 0 permits filed
223 permits since 2000: 189 completed, 13 never finaled, 21 expired or cancelled.
Of the 13 never-finaled permits, 3 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 25 completed. Typically 0 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2019 | Completed final sign-off Jun 2020 | 1159 Oak St | interior remodel e 2 story w partial garage, single family dwelling including remove non load bearing int partitions on gr fl. demo e gr fl bath, replace 2 new bathsDetails
interior remodel e 2 story w partial garage, single family dwelling including remove non load bearing int partitions on gr fl. demo e gr fl bath, replace 2 new baths | $20,500 |
| Sep 14, 2017 | Completed final sign-off Oct 2018 | 100 Hearst Av | replace ktichen cabinets & countertop in kind. upgrade electrical & plumbing, replace existing fixtrues in bathroom in kind. upgrade electrical & plumbing. prime & paint, refinish hardwood floors.Details
replace ktichen cabinets & countertop in kind. upgrade electrical & plumbing, replace existing fixtrues in bathroom in kind. upgrade electrical & plumbing. prime & paint, refinish hardwood floors. | $9,500 |
| Jul 5, 2016 | Completed final sign-off Jun 2017 | 17 Liberty St | revision to ref pa 201606089362- remove 1 toilet in bath 1 and to add a pocket door between bath 1 and the w/c anbd to move tub/shower plumbing to opposite end of tub. (e) laundry sink on ground flr to be removed.Details
revision to ref pa 201606089362- remove 1 toilet in bath 1 and to add a pocket door between bath 1 and the w/c anbd to move tub/shower plumbing to opposite end of tub. (e) laundry sink on ground flr to be removed. | |
| Jun 8, 2016 | Completed final sign-off Jun 2017 | 17 Liberty St | remodel bath, add new bath and w/c. remove and replace windows and doors. add laundry closet and skylight.Details
remodel bath, add new bath and w/c. remove and replace windows and doors. add laundry closet and skylight. | $49,500 |
| Dec 2, 2014 | Completed final sign-off Feb 2016 | 2858 Vallejo St | interior remodel of single family including relocation of existing groudn floor bathroom and stair.Details
interior remodel of single family including relocation of existing groudn floor bathroom and stair. | $19,000 |
| Oct 28, 2014 | Completed final sign-off Jan 2016 | 2858 Vallejo St | upgrade electrical & plumbing in two (e) bathrooms, repair all damaged framing, replace all fixtures & finishes in-kind.Details
upgrade electrical & plumbing in two (e) bathrooms, repair all damaged framing, replace all fixtures & finishes in-kind. | $37,500 |
| Feb 6, 2014 | Completed final sign-off May 2014 | 29 Pleasant St | repair all dryrot in where master bathroom upgrade electrical and plumbing; replace all finishes and fixtures; to comply with cec150(k)Details
repair all dryrot in where master bathroom upgrade electrical and plumbing; replace all finishes and fixtures; to comply with cec150(k) | $9,300 |
| May 2, 2013 | Completed final sign-off Jun 2014 | 4314 19th St | dry rot repairs in existing bath, powder room & kitchen with finish. repair/replacement in kind in 2 units. upgrade lectrical and plumbing as required.Details
dry rot repairs in existing bath, powder room & kitchen with finish. repair/replacement in kind in 2 units. upgrade lectrical and plumbing as required. | $33,500 |
| Mar 18, 2011 | Completed final sign-off Jan 2016 | 2255 Octavia St | upgrade 2 (e) bathrooms, no change to layout, in kind. lighting to comply with cec 150(k). no change to walls windows or doors. upgrade electrical outlets at (e) 2 bedrooms at top floor. lighting new dimmerDetails
upgrade 2 (e) bathrooms, no change to layout, in kind. lighting to comply with cec 150(k). no change to walls windows or doors. upgrade electrical outlets at (e) 2 bedrooms at top floor. lighting new dimmer | $18,500 |
| Jan 10, 2011 | Completed final sign-off May 2011 | 1871 Green St | demolish 2 bathrooms on 1st fl, 1 on 2nd floor, no structural removal. remove gyp board finish work.Details
demolish 2 bathrooms on 1st fl, 1 on 2nd floor, no structural removal. remove gyp board finish work. | $1,500 |
| Nov 2, 2010 | Completed final sign-off Dec 2010 | 176 Haight St | interior remodel. creat a new den with half-bath and w/d in ground floor storage area. remove (e) brick chimneyDetails
interior remodel. creat a new den with half-bath and w/d in ground floor storage area. remove (e) brick chimney | $55,000 |
| Sep 22, 2010 | Completed final sign-off Oct 2011 | 1871 Green St | addition to south wall of 3rd floor over (e) floor below, removal of (e) non bearing partition & contruction of (n) bathroom on 3rd floor; revision to (e) deck at 3rd floor. (n) non brg partition alterations on 2nd floor & relocation of stair from (e) deck to rear yard. reconstruciton of (e) wall atDetails
addition to south wall of 3rd floor over (e) floor below, removal of (e) non bearing partition & contruction of (n) bathroom on 3rd floor; revision to (e) deck at 3rd floor. (n) non brg partition alterations on 2nd floor & relocation of stair from (e) deck to rear yard. reconstruciton of (e) wall at | $89,000 |
| Jan 8, 2010 | Completed final sign-off Mar 2010 | 435 22nd Av | upgrade kitchen & bathroom-re-install all (e) fixtures. kitchen: new linoleum, counter top & electrical. bathroom: new tub & sink. kitchen 50% of light wattage must be of high efficiency, bathroom hihg efficiency lights or manaul 'on' occupancy sensorDetails
upgrade kitchen & bathroom-re-install all (e) fixtures. kitchen: new linoleum, counter top & electrical. bathroom: new tub & sink. kitchen 50% of light wattage must be of high efficiency, bathroom hihg efficiency lights or manaul 'on' occupancy sensor | $10,000 |
| Dec 7, 2009 | Completed final sign-off Jun 2010 | 201 Upper Tr | interior remodel of 201 upper terrace by new stairs to (e) garage space. convert to family room, bedroom, laundry & bathroom. building currently has 4 parking spaces with this remodel is has 2. replacement windows throughoutDetails
interior remodel of 201 upper terrace by new stairs to (e) garage space. convert to family room, bedroom, laundry & bathroom. building currently has 4 parking spaces with this remodel is has 2. replacement windows throughout | $35,000 |
| Apr 8, 2009 | Completed final sign-off Sep 2009 | 1457 Guerrero St | work @ unit# 1457 only. repair dry rot in bathroom & kitchen floor. upgrade plumbing & electrical. replace all finishes in kind. repair of floors dry rot.Details
work @ unit# 1457 only. repair dry rot in bathroom & kitchen floor. upgrade plumbing & electrical. replace all finishes in kind. repair of floors dry rot. | $7,750 |
| Aug 31, 2005 | Completed final sign-off Jul 2007 | 2814 Pine St | convert (e) third level deck @ back to a master bathroom. add (2) window seat areas at third level master bedroom. proposed area total less than 500 sq.ft.Details
convert (e) third level deck @ back to a master bathroom. add (2) window seat areas at third level master bedroom. proposed area total less than 500 sq.ft. | $50,000 |
| May 23, 2005 | Completed final sign-off Aug 2005 | 1385 Greenwich St | remove sheetrock in bathroom, replace tile, dry wall in bathroom. install kitchen cabinets.Details
remove sheetrock in bathroom, replace tile, dry wall in bathroom. install kitchen cabinets. | $1,500 |
| May 16, 2005 | Completed final sign-off Aug 2005 | 1385 Greenwich St | remove and relace sheetrock in bathroom and kitchen of unit 14, approx 25% of unitDetails
remove and relace sheetrock in bathroom and kitchen of unit 14, approx 25% of unit | $1,000 |
| Nov 23, 2004 | Completed final sign-off Mar 2005 | 166 Caselli Av | replace ex kitchen cabinets in kind upgrade electric and plumb in kitchen,bath,laudnry,replace shtrkDetails
replace ex kitchen cabinets in kind upgrade electric and plumb in kitchen,bath,laudnry,replace shtrk | $46,500 |
| Jul 27, 2004 | Completed final sign-off Sep 2004 | 427 Hill St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $14,000 |
| Oct 3, 2001 | Completed final sign-off Mar 2002 | 2806 Pine St | remodel (e) kitchen & upstairs, bathroom, replace cabinets, upgrade electrical & plumbing, paintDetails
remodel (e) kitchen & upstairs, bathroom, replace cabinets, upgrade electrical & plumbing, paint | $15,000 |
| Mar 7, 2001 | Completed final sign-off Sep 2001 | 2806 Pine St | replace & repair (e) brick foundation, replace slab, reinstall (e) bathDetails
replace & repair (e) brick foundation, replace slab, reinstall (e) bath | $58,000 |
| Aug 15, 2000 | Completed final sign-off Sep 2002 | 214 Precita Av | remodel bathroom and kitchen, change windows in the front and back of the house-replacement windowsDetails
remodel bathroom and kitchen, change windows in the front and back of the house-replacement windows | $15,000 |
| May 8, 2000 | Completed final sign-off Jan 2001 | 3235 Pacific Av | kitchen remodel & bathroom & bedroomDetails
kitchen remodel & bathroom & bedroom | $50,000 |
| Feb 29, 2000 | Completed final sign-off Jan 2001 | 3235 Pacific Av | remodel existing bathroom, replace plbg, elec,repair any necessary framingDetails
remodel existing bathroom, replace plbg, elec,repair any necessary framing |