Back to bathroom remodel contractors
Hornor Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Jan 2014
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2011 | Completed final sign-off Sep 2011 | 2825 Filbert St | remodel existing 2nd flr bath, replace fixtures, upgrade plumbing and electrical new drywall, tile, paint, all (n) lighting must comply with cec 150(k)Details
remodel existing 2nd flr bath, replace fixtures, upgrade plumbing and electrical new drywall, tile, paint, all (n) lighting must comply with cec 150(k) | $25,000 |
| Jul 9, 2008 | Completed final sign-off Dec 2008 | 3133 Franklin St | remodel existing bathroom. no structural work. replacing fixtgures, new tile, shower, lighting and switches, new floor (tile) & cabinets. lighting to comply w/title 24.Details
remodel existing bathroom. no structural work. replacing fixtgures, new tile, shower, lighting and switches, new floor (tile) & cabinets. lighting to comply w/title 24. | $20,000 |
| May 17, 2007 | Completed final sign-off Oct 2007 | 1386 Masonic Av | remodel (e) 2nd floor bathroom. infill (e) lightwell.Details
remodel (e) 2nd floor bathroom. infill (e) lightwell. | $18,000 |
| Apr 12, 2000 | Completed final sign-off Apr 2001 | 60 Marcela Av | remodel kitchen & 1/2 bath & master bathroom in kind, replace 4 windowsDetails
remodel kitchen & 1/2 bath & master bathroom in kind, replace 4 windows | $50,000 |