Back to bathroom remodel contractors
Hope Construction Inc.
- Based in
- San Mateo
- On San Francisco permits
- Dec 2008 to Apr 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 28 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2008 | Completed final sign-off Jan 2010 | 459 Los Palmos Dr | convert family room at basement into 2 bedrooms, add full bath, revise stairs to 1st fl, remodel kitchen, new utility rm, add rear deck at lower level, sliding doors to rear yard, remodel upper bath fixtures.Details
convert family room at basement into 2 bedrooms, add full bath, revise stairs to 1st fl, remodel kitchen, new utility rm, add rear deck at lower level, sliding doors to rear yard, remodel upper bath fixtures. | $60,000 |