Homeswest Renovations Inc.
- Based in
- Mill Valley
- On San Francisco permits
- Sep 2010 to Nov 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2010 | Completed final sign-off Jan 2011 | 1027 Pacific Av | remodel kitchen all appliances in same position, remodel bathroom, all fixtures in same position, add stalking gas washer/dryer in existing utility, repl hot water heater with on-demant heater, combustion air to comply with mechanical codeDetails
remodel kitchen all appliances in same position, remodel bathroom, all fixtures in same position, add stalking gas washer/dryer in existing utility, repl hot water heater with on-demant heater, combustion air to comply with mechanical code | $19,500 |