Back to bathroom remodel contractors
Homeowner's Permit
- Based in
- Seattle
- On San Francisco permits
- Jul 2018 to Sep 2026
- Last 24 months
- 47 permits filed
Also written on permits as: Das Simplified (Interim).
55 permits since 2000: 23 completed, 30 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 1 completed, 5 in progress, 1 never finaled. Typically 19 days from filing to permit and 65 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 1874 31st Av | remodel (e) bathroom, install wet bar and construct fire wall, fire door at gf, remodel (e) bathroom at second floor, remodel 2 (e) bathroom at 3rd floor.Details
remodel (e) bathroom, install wet bar and construct fire wall, fire door at gf, remodel (e) bathroom at second floor, remodel 2 (e) bathroom at 3rd floor. | $108,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 611 Pennsylvania Av | revision to 202605010470: move water heater location, change to doorway position for bathroomDetails
revision to 202605010470: move water heater location, change to doorway position for bathroom | |
| May 28, 2026 | In progress issued Jun 2026 | 75 Montana St | remodel kitchen and 2 bathrooms; remove a wall btw kitchen and living room; replace 2 windows on the 2nd fl bedrooms; install sliding glass door on the 1st fl bedroom recess front wall opening o its original construction conditionDetails
remodel kitchen and 2 bathrooms; remove a wall btw kitchen and living room; replace 2 windows on the 2nd fl bedrooms; install sliding glass door on the 1st fl bedroom recess front wall opening o its original construction condition | $40,000 |
| Apr 3, 2026 | In progress issued May 2026 | 1161 Filbert St | remodel (1) kitchen and (1) bath in kind.Details
remodel (1) kitchen and (1) bath in kind. | $30,000 |
| Apr 3, 2026 | In progress issued May 2026 | 1165 Filbert St | remodel (1) kitchen and (2) baths in kind.Details
remodel (1) kitchen and (2) baths in kind. | $30,000 |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 1163 Alabama St | remodel kitchen and bathroom, including electrical, plumbing, drywall. new lighting, appliances, floors.Details
remodel kitchen and bathroom, including electrical, plumbing, drywall. new lighting, appliances, floors. | $50,000 |
| Jul 30, 2018 | Completed final sign-off Oct 2018 | 2296 28th Av | remodel (2) bathrooms. replace old tiles, fixtures, and vanities 5' by 8' each. lighting per cenc 150(k)Details
remodel (2) bathrooms. replace old tiles, fixtures, and vanities 5' by 8' each. lighting per cenc 150(k) | $5,000 |