Back to bathroom remodel contractors
Home Quality Remodeling
- Based in
- Concord
- On San Francisco permits
- Sep 2006 to Jul 2026
- Last 24 months
- 13 permits filed
54 permits since 2000: 39 completed, 7 in progress, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 25 completed, 2 in progress, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 416 Carl St | a unit int. remodel in kind incl. the kitchen, 1 bathroom,lvp flooring replacement,interior painting,drywall repairs,cabinets,countertops,front door.backsplash,fixtures, lighting,gfci outlets,plumbing upgrades,electrical upgrades,ventilation fan, theormostat,intercom replacement,not facing streetDetails
a unit int. remodel in kind incl. the kitchen, 1 bathroom,lvp flooring replacement,interior painting,drywall repairs,cabinets,countertops,front door.backsplash,fixtures, lighting,gfci outlets,plumbing upgrades,electrical upgrades,ventilation fan, theormostat,intercom replacement,not facing street | $112,500 |
| Nov 26, 2025 | Completed final sign-off Sep 2026 | 835 Alabama St | like for like kitchen remodel, like for like guest bathroom remodel, like for like master bathroom remodel, tub to shower, shower to be 1024 sq in min & 30" diamter min.Details
like for like kitchen remodel, like for like guest bathroom remodel, like for like master bathroom remodel, tub to shower, shower to be 1024 sq in min & 30" diamter min. | $70,000 |
| Aug 29, 2025 | Completed final sign-off Mar 2026 | 353 Crestlake Dr | (1) like for like bathroom remodel.Details
(1) like for like bathroom remodel. | $20,000 |
| Sep 6, 2024 | Completed final sign-off Mar 2025 | 2068 03rd St | 2 bathroom remodel like for like (one convert to shower) + 1 kitchen remodel like for like. no new wall and no existing wall relocation. plumbing fixtuires count remain same. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
2 bathroom remodel like for like (one convert to shower) + 1 kitchen remodel like for like. no new wall and no existing wall relocation. plumbing fixtuires count remain same. new lighting shall comply with cec 150.0(k)3 & (k)5. | $60,000 |
| Jul 5, 2024 | Completed final sign-off Feb 2026 | 419 27th St | to comply with complaint #202423885. legalize an unpermited unit under zoning oridinance second floor. reconfigure layout to impprove kitchen, family room and bathroom.Details
to comply with complaint #202423885. legalize an unpermited unit under zoning oridinance second floor. reconfigure layout to impprove kitchen, family room and bathroom. | $129,000 |
| Jun 25, 2024 | In progress issued Jun 2024 | 4331 Kirkham St | 3/f bathroom remodel. remove bath tub, enlarge shower, update plumbing and electrical up to codeDetails
3/f bathroom remodel. remove bath tub, enlarge shower, update plumbing and electrical up to code | $15,000 |
| Oct 27, 2023 | Completed final sign-off Dec 2023 | 249 Coleridge St | like to like bathroom remodel. upgrade plumbing and electric up to code located @ 1st story.Details
like to like bathroom remodel. upgrade plumbing and electric up to code located @ 1st story. | $20,000 |
| Jul 31, 2023 | Completed final sign-off Feb 2024 | 8 Hidalgo Tr | master bathroom remodel and powder room remodel in kind. (6) windows new construction replace in kind and not visible from the street- same size and same location.Details
master bathroom remodel and powder room remodel in kind. (6) windows new construction replace in kind and not visible from the street- same size and same location. | $65,000 |
| Apr 24, 2023 | Completed final sign-off Aug 2023 | 701 Minna St | #5: to comply w/nov# 202287173, 2-bathroom remodel like for like, upgrade electrical & plumbing.Details
#5: to comply w/nov# 202287173, 2-bathroom remodel like for like, upgrade electrical & plumbing. | $20,321 |
| Oct 6, 2021 | Expired or cancelled expired May 2025 | 471 Los Palmos Dr | remodel kitchen ,remove load bearing wall and relocate window per plan. master bathroom remodel, relocate bathroom window per plan, relocate subpanel.Details
remodel kitchen ,remove load bearing wall and relocate window per plan. master bathroom remodel, relocate bathroom window per plan, relocate subpanel. | $70,700 |
| Aug 5, 2021 | Completed final sign-off Jan 2022 | 348 Dolores St | rev to pa 202105069905: remove non-loadbearing ball in the bathroom and extend bathroom into dining room by building new wall. relocate toilet, move laundry to where toilet was.Details
rev to pa 202105069905: remove non-loadbearing ball in the bathroom and extend bathroom into dining room by building new wall. relocate toilet, move laundry to where toilet was. | |
| May 17, 2021 | Never finaled issued May 2021, no final | 4644 Irving St | like for like, one kitchen & one bathroom , new drywall throughout, new eletrical upgrae main and sub panel, new floors and paint, replace 14 windows (retrofit) facing street.Details
like for like, one kitchen & one bathroom , new drywall throughout, new eletrical upgrae main and sub panel, new floors and paint, replace 14 windows (retrofit) facing street. | $92,700 |
| May 6, 2021 | Completed final sign-off Jan 2022 | 348 Dolores St | like for like bathroom & kitchen remodel.Details
like for like bathroom & kitchen remodel. | $37,000 |
| Mar 4, 2021 | Completed final sign-off May 2022 | 170 Midcrest Wy | like to like bathroom remodel, upgrade electrical and plumbing per code.Details
like to like bathroom remodel, upgrade electrical and plumbing per code. | $15,700 |
| Dec 9, 2020 | Expired or cancelled expired Mar 2023 | 525 Arch St | interior remodel includes in-kind bath, partial kitchen, new half bath and minor associated structural work.Details
interior remodel includes in-kind bath, partial kitchen, new half bath and minor associated structural work. | $35,000 |
| Dec 9, 2020 | Completed final sign-off Apr 2023 | 525 Arch St | basement: convert 1248 sq. ft. of basement to conditioned space to 2 bathrooms, 2 bedrooms, laundry & living space. converts garage to habitable space adds a minimum 4 ft. high screen/gate at front edge of house to shield new parking space behind this screened area; note:parking in fy setbackDetails
basement: convert 1248 sq. ft. of basement to conditioned space to 2 bathrooms, 2 bedrooms, laundry & living space. converts garage to habitable space adds a minimum 4 ft. high screen/gate at front edge of house to shield new parking space behind this screened area; note:parking in fy setback | $125,000 |
| Nov 2, 2020 | Completed final sign-off Apr 2021 | 380 10th St | unit 28: relocate vanity from closet to bathroom.Details
unit 28: relocate vanity from closet to bathroom. | $1,000 |
| Feb 6, 2020 | Completed final sign-off Mar 2020 | 919 Vermont St | bathroom remodel in-kindDetails
bathroom remodel in-kind | $15,000 |
| Sep 23, 2019 | Completed final sign-off Jul 2020 | 1125 Francisco St | unit 4 - minor remodel to convert hallway closet to 1/2 bath; change dining room to closet.Details
unit 4 - minor remodel to convert hallway closet to 1/2 bath; change dining room to closet. | $10,000 |
| Aug 19, 2019 | Completed final sign-off Jan 2020 | 1133 Brussels St | bathroom remodeling like to like on 1st fl.Details
bathroom remodeling like to like on 1st fl. | $18,000 |
| Aug 6, 2019 | Completed final sign-off May 2020 | 51 Sussex St | alteration basement into family room, master bedroom & bathroom remodel, new skylight, rear facade changes as required, new entry infillDetails
alteration basement into family room, master bedroom & bathroom remodel, new skylight, rear facade changes as required, new entry infill | $100,000 |
| Jul 26, 2019 | Completed final sign-off Jul 2020 | 863 Foerster St | interior remodel for kitchen, dining room & master bath & closetDetails
interior remodel for kitchen, dining room & master bath & closet | $100,000 |
| Jul 22, 2019 | Completed final sign-off Oct 2019 | 1133 Brussels St | hallway bathroom remodeling like for like.Details
hallway bathroom remodeling like for like. | $20,000 |
| Apr 29, 2019 | Completed final sign-off Jul 2019 | 249 Shipley St | unit 5. bathroom remodels change from tub to walk-in shower. half bath remodel, 5'x7'.Details
unit 5. bathroom remodels change from tub to walk-in shower. half bath remodel, 5'x7'. | $25,000 |
| Apr 15, 2019 | Completed final sign-off Jul 2019 | 426 14th St | remodel bathroom in kindDetails
remodel bathroom in kind | $20,000 |
| Mar 6, 2019 | Completed final sign-off Jul 2019 | 2763 38th Av | bathroom remodeling - "like for like". install new tub, install new shower pan, water proof walls and floors of wet areas. upgrade all electrical, mech, plumbing up to code. patch walls. install vanity, mirror, fan & humidity sensor.Details
bathroom remodeling - "like for like". install new tub, install new shower pan, water proof walls and floors of wet areas. upgrade all electrical, mech, plumbing up to code. patch walls. install vanity, mirror, fan & humidity sensor. | $22,850 |
| Nov 29, 2018 | Completed final sign-off Dec 2019 | 367 Moscow St | full kitchen remodel removing a load bearing wall like for loke full bathroom remodelDetails
full kitchen remodel removing a load bearing wall like for loke full bathroom remodel | $40,000 |
| Nov 28, 2018 | Completed final sign-off Dec 2018 | 490 33rd Av | bathroom - replace tile on bath rm floor around vanity, replace vanity, install recess light. no walls moved, removed, added, or infilled. all (e) layouts to remain unchangedDetails
bathroom - replace tile on bath rm floor around vanity, replace vanity, install recess light. no walls moved, removed, added, or infilled. all (e) layouts to remain unchanged | $10,000 |
| Jun 27, 2018 | Completed final sign-off Nov 2018 | 179 Brompton Av | relocate walls at lower living level, new bath, electricalDetails
relocate walls at lower living level, new bath, electrical | $600,000 |
| Oct 29, 2008 | Completed final sign-off Feb 2009 | 56 Deming St | removal walls between master bath & bedroom closet, remodel master bath, expand area from closet. new closet in bedroom 1, remove wall between small bath & hallway closet. expand & remodel small bath, place ceiling ventilation fans. electrical outlets, plumbing with new showers, tub.Details
removal walls between master bath & bedroom closet, remodel master bath, expand area from closet. new closet in bedroom 1, remove wall between small bath & hallway closet. expand & remodel small bath, place ceiling ventilation fans. electrical outlets, plumbing with new showers, tub. | $30,000 |