Back to bathroom remodel contractors
Hollman's Construction
- Based in
- Pittsburg
- On San Francisco permits
- Sep 2011 to Sep 2011
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2011 | Never finaled issued Sep 2011, no final | 1145 Pine St | bathroom upgrade, shower valve replacement, reinstall tub, new sinks and toilet, frame new medicin cabnet and arch mitch for decorative, esast fan, flo can lts, replace kchn cabinets and nw coutertops with new sink an faucet, same location. 4th floor can ltg in ktch, cieling , replace switches/plgsDetails
bathroom upgrade, shower valve replacement, reinstall tub, new sinks and toilet, frame new medicin cabnet and arch mitch for decorative, esast fan, flo can lts, replace kchn cabinets and nw coutertops with new sink an faucet, same location. 4th floor can ltg in ktch, cieling , replace switches/plgs | $75,000 |