Holden James Inc.
- Based in
- Santa Rosa
- On San Francisco permits
- Jun 2008 to Sep 2010
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2010 | Completed final sign-off Jan 2011 | 345 Franconia St | construction of deck @ rear. door installation, kitchen remodelDetails
construction of deck @ rear. door installation, kitchen remodel | $15,000 |
| Jun 14, 2010 | Never finaled issued Jun 2010, no final | 300 Beale St | unit 416. kitchen and bath remodeling, cabinet replace. new counter tops. new sink. new faucet. all elec. and plumbimg rough will not be touched. same rough same locationDetails
unit 416. kitchen and bath remodeling, cabinet replace. new counter tops. new sink. new faucet. all elec. and plumbimg rough will not be touched. same rough same location | $30,000 |
| Mar 18, 2009 | Completed final sign-off Oct 2009 | 2145 Franklin St | unit #6 - remove/replace vanity, remove tub & install shower, remove/replace toilet & existing window, update electrical & add cans, install tile @ bath #1 area. remove/replace tub, toilet & vanity, update electrical, add cans, install tile @ bath #2.Details
unit #6 - remove/replace vanity, remove tub & install shower, remove/replace toilet & existing window, update electrical & add cans, install tile @ bath #1 area. remove/replace tub, toilet & vanity, update electrical, add cans, install tile @ bath #2. | $35,000 |
| Jun 10, 2008 | Completed final sign-off Jul 2009 | 175 Middlefield Dr | ground floor remodeling of a single family dwelling. add one bath, one closet at ground floor. relocate washer & dryer. convert (e) storage to a (n) bedroom.Details
ground floor remodeling of a single family dwelling. add one bath, one closet at ground floor. relocate washer & dryer. convert (e) storage to a (n) bedroom. | $10,000 |