Back to bathroom remodel contractors
Ho's Contractors Co
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Feb 2011
- Last 24 months
- 0 permits filed
18 permits since 2000: 17 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2011 | Completed final sign-off Aug 2011 | 3981 18th St | remodel bath, install cabinets, sink, faucet,hood, new tiles, bathtub,steam shower system, toilet, change new elec panel. no change to walls, windows,door. lighting tom comply w cec 150kDetails
remodel bath, install cabinets, sink, faucet,hood, new tiles, bathtub,steam shower system, toilet, change new elec panel. no change to walls, windows,door. lighting tom comply w cec 150k | $15,500 |
| Aug 17, 2010 | Never finaled issued Aug 2010, no final | 3418 19th St | remodel kitchen-change cabinets, lights, outlets, change sink & faucet. bathroom change-cabinet, sink, light, outlets. kitchen: at least 50% high efficacy (by wattage) lighting. bathroom: high efficacy or occupancy sensor. no change to exhaust systemDetails
remodel kitchen-change cabinets, lights, outlets, change sink & faucet. bathroom change-cabinet, sink, light, outlets. kitchen: at least 50% high efficacy (by wattage) lighting. bathroom: high efficacy or occupancy sensor. no change to exhaust system | $5,000 |
| Aug 3, 2009 | Completed final sign-off Feb 2010 | 7 Ulloa St | ground floor remodeling. one new bedroom, one new family room, and one new full bath room per plan.Details
ground floor remodeling. one new bedroom, one new family room, and one new full bath room per plan. | $50,820 |
| Jul 9, 2008 | Completed final sign-off Jan 2009 | 844 Cabrillo St | convert ex. storage space on the grd flr to new family rm and bathroom. remodeling of kitchen and bathrooms on the 2nd and 3rd floors. replace ex. rear door on the ground floor with a new french door. add new hall with 2 doors.Details
convert ex. storage space on the grd flr to new family rm and bathroom. remodeling of kitchen and bathrooms on the 2nd and 3rd floors. replace ex. rear door on the ground floor with a new french door. add new hall with 2 doors. | $185,000 |
| Mar 3, 2008 | Completed final sign-off Aug 2008 | 7 Ulloa St | kitchen & bathroom remodeling on 2nd floor, change (3) windows in kind. no structural. windows not visible from street, 0.67 u factor max. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor.Details
kitchen & bathroom remodeling on 2nd floor, change (3) windows in kind. no structural. windows not visible from street, 0.67 u factor max. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor. | $20,000 |
| Nov 19, 2007 | Completed final sign-off Jul 2008 | 2950 22nd Av | kitchen remodeling & new bathroom on 2nd floor.Details
kitchen remodeling & new bathroom on 2nd floor. | $20,000 |
| May 21, 2007 | Completed final sign-off Jul 2007 | 1991 34th Av | revision to 200704098282. will not do bathroom and furnace replacementDetails
revision to 200704098282. will not do bathroom and furnace replacement | |
| Apr 9, 2007 | Completed final sign-off Jul 2007 | 1991 34th Av | remodel kitchen & bathroom, change cabinets, stove, sinks, faucets. install fan hood lights & bathtub. change new heater system. 50% of kitchen light watt shall be fluorescent. fluorescent or o .s. in bathroom.Details
remodel kitchen & bathroom, change cabinets, stove, sinks, faucets. install fan hood lights & bathtub. change new heater system. 50% of kitchen light watt shall be fluorescent. fluorescent or o .s. in bathroom. | $18,000 |
| Nov 7, 2005 | Completed final sign-off Jan 2006 | 1986 34th Av | removel kitchen bath. change cabinets, stove, sinks, faucet. install air fan and bathDetails
removel kitchen bath. change cabinets, stove, sinks, faucet. install air fan and bath | $12,000 |