Hill's Pool Service Inc.
- Based in
- Burlingame
- On San Francisco permits
- Jan 2007 to Feb 2023
- Last 24 months
- 0 permits filed
14 permits since 2000: 11 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 14 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 3, 2021 | Completed final sign-off Aug 2022 | 165 28th Av | install outdoor handicap lift in rear yard. install new pool tile. demo the existing deck tile and install new tile pool remodel (new plaster, coping and tile).Details
install outdoor handicap lift in rear yard. install new pool tile. demo the existing deck tile and install new tile pool remodel (new plaster, coping and tile). | $110,000 |
| Aug 19, 2010 | Completed final sign-off May 2011 | 370 Church St | build concrete spa with 6 therapy jets and 3 return filter lines and one led light in the back yard, on existing lower deck.Details
build concrete spa with 6 therapy jets and 3 return filter lines and one led light in the back yard, on existing lower deck. | $50,000 |