Hildula Enterprises Inc Dba Niche Constr
- Based in
- Martinez
- On San Francisco permits
- Apr 2019 to Sep 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2022 | Completed final sign-off Nov 2022 | 1520 Taylor St | construct waterproof cap on existing elevator/stair at penthouse.Details
construct waterproof cap on existing elevator/stair at penthouse. | $28,000 |
| Apr 22, 2019 | Never finaled issued Apr 2019, no final | 30 Romain St | comply with nov # 201811253, items #1,2,4,5,10,11,12,13. 1) repair/replace dryrot at bottom run of front entry stairs with decay resisted materials (repair at 50% or <). 2) install water supply valve in refridgerator pocket 3) repair/replace 10-12 sqft. underlay damage. 4) replace vinyl flooringDetails
comply with nov # 201811253, items #1,2,4,5,10,11,12,13. 1) repair/replace dryrot at bottom run of front entry stairs with decay resisted materials (repair at 50% or <). 2) install water supply valve in refridgerator pocket 3) repair/replace 10-12 sqft. underlay damage. 4) replace vinyl flooring | $3,500 |